6
-
3
6.3 Unloading the Cart (Continued)
4.
Slowly tilt the tank to empty into the
receiving unit. Monitor the amount of
distribution of the load in the receiving
unit.
NOTE:
It may be necessary to adjust the
distance between the cart and the receiving
unit or height of the tank when it is tilted.
Lower the tank before moving the cart. Make
note of any changes to position between the
cart and receiving unit for the next unloading.
5.
Use the unloading chains to better control
the amount and distribution from the tank
to the receiving unit. The chains can be
used to initiate the unloading process
before the tank is completely tilted. The
unloading chains can also be used to
dislodge any material left in the lower
right corner of the tank. Speed of the
chains can be changed by adjusting the
hydraulic flow.
6.
Return the tank to travel position.
7.
Drive straight forward until the back of the
tank is clear of the receiving unit including
the tow vehicle before turning. The cart
pivots on the tracks and the back of the
cart swings out during turns.
8.
After the final load of the day or shift,
clean any excess product from the tank. If
left, it can dry and harden which will cause
excess buildup during the next use.
Figure 6
-
4: Tilting Tank
Figure 6
-
5: Use of Unloading Chains
Figure 6
-
6: Cart in Lowered Position
Содержание Crop Chaser 1000
Страница 2: ...i This page is intentionally left blank ...
Страница 4: ...iii This page is intentionally left blank ...
Страница 16: ...3 3 168 283 in 161 439 in 161 439 in 424 214 in ...