GENERAL MAINTENANCE

The tests and inspections specified below apply only to the Amico Economy Manifold and not to the medical gas pipeline 

system as a whole. They are intended to help ensure the proper operation of the manifold and not to be interpreted as 

repair instructions. Fault finding and repair procedures are given in the Troubleshooting section of this manual.

CONTROL EQUIPMENT

Control equipment should be inspected and tested according to the following schedule:

1.  PRESSURE REGULATOR

•  Observe and record line pressure periodically
•  Test for external leaks annually

2.  PRESSURE RELIEF VALVES

•  Determine the pressure at which relief occurs at least annually and compare with the requirements of clause 

4-3.1.8.5. of NFPA 99.

3.  HIGH PRESSURE INLET VALVE (MANIFOLD HAND VALVES)

•  Inspect once annually and test for external leakage and tightness when opening and closing the valve.

CYLINDER EXTENSION BARS

The following components shall be inspected annually:

1.  Test check valves of pigtail assemblies for proper closure.

2.  Inspect pigtail assemblies for apparent damage and thread damage to cylinder connections, replacing all 

damaged pigtails immediately.

NOTE: 

Replace ALL pigtails after five years of service. The cylinders and the operating regulators of a Nitrous Oxide or a 

Carbon Dioxide supply system shall be observed daily during peak demand periods to determine whether they show 

frosting or condensation on the surface. Where this is evident, the system shall be further inspected for evidence of 

leaks and should excessive condensation or frosting occur, the option would be to add more cylinders to increase the 

volume or to upgrade to an Amico Corporation Microprocessor Automatic Manifold with a built in heater kit.

PERIODIC STANDING PRESSURE TEST

At intervals of not more than two years, a one hour standing pressure test shall be made on each medical gas system to 

check for leakage.

Maintenance 

Содержание Carbon Dioxide

Страница 1: ...Installation Maintenance Manual Economy Manifold...

Страница 2: ...m Systems 6 Safety Features 6 Installation 7 Receipt and Location 7 Cylinder Bank Installation Instructions 7 Operation Procedures 8 Maintenance 9 General Maintenance 9 Control Equipment 9 Cylinder Ex...

Страница 3: ...sembled operated maintained and serviced in accordance with the installation instructions provided The manifold MUST be checked periodically Parts that are broken missing worn distorted or contaminate...

Страница 4: ...zer informing the facility personnel that the In Use cylinder bank pressure is low and the cylinders need replacement At this point it is necessary to silence the alarm or buzzer and manually switch t...

Страница 5: ...ical Air and Carbon Dioxide service the line regulator should be set at 55 psig 379 kPa For Nitrogen service the regulator is set at 170 psig 1 172 kPa Pressure Relief Valves Pressure relief valves ar...

Страница 6: ...is a preset pressure switch Its function is to send a signal to the alarm unit when the operating pressure drops below its set point For Medical Air Oxygen Carbon Dioxide and Nitrous Oxide the pressur...

Страница 7: ...nder extension bar to the support using the U bolts supplied as part of the assemblies Remove the plug and chain assembly on each outlet connection on the cylinder extension bar Attach the cylinder pi...

Страница 8: ...to 140 psi decreasing pressure and will alarm when the In Use bank is depleted 5 To switchover simply move the lever from the depleted bank to the opposite bank to indicate the bank In Use This reset...

Страница 9: ...ng and closing the valve CYLINDER EXTENSION BARS The following components shall be inspected annually 1 Test check valves of pigtail assemblies for proper closure 2 Inspect pigtail assemblies for appa...

Страница 10: ...cap Worn out diaphragm Replace regulator with substitute unit or use repair kit to rebuild Venting at intermediate relief valve Over pressure due to creeping or faulty regulation by pressure regulator...

Страница 11: ...en the cylinder valve on the cylinder closest to the control cabinet Watch the bank pressure display on the front of the cabinet to make sure the pressure rises slowly to the full cylinder pressure re...

Страница 12: ...s with check valve for Oxygen Nitrous Ox ide Carbon Dioxide and Nitrogen M X HB PTC GAS OXY N2O AIR CO2 NIT Stainless steel pigtail comes with check valve for Nitrous Oxide Carbon Dioxide and Nitrogen...

Страница 13: ...MANIFOLD INTERNAL LAYOUT Pressure Switch Left Bank Gauge Left Bank Regulator Right Bank Gauge Right Bank Regulator Line Relief Valve Line Gauge Line Regulator Lower Pressure Gauge Operating Relief Va...

Страница 14: ...ndix B MANIFOLD DIMENSIONS Installation Mounting holes are 13 and 15 33 02 cm and 38 1 cm apart at the top and bottom of the back plate Use appropriate anchors supplied by others 3 8 9 525 mm diameter...

Страница 15: ...co com 15 WIRING TO ALARM BUZZER Appendix C Inch mm Power Alarm Mute Test Medical Gas Alarm Alert MEDICAL SUPPLY STATUS Power Maintenance Optional Monitoring Devices Master Alarm Remote Buzzer 7 75 19...

Страница 16: ...ay Richmond Hill ON L4B 2N4 Canada 71 East Industry Court Deer Park NY 11729 USA Toll Free Tel 1 877 462 6426 Tel 905 764 0800 Fax 905 764 0862 Email info amico com www amico com ACP INSTALL MAINT ECO...

Отзывы: