www.amico.com
7
RECEIPT AND LOCATION
The Amico Corporation manifold should be carefully examined upon receipt. If any damages are found, a claim should
be filed with the Transport Company and Amico Corporation. Any authorized dealers and distributors should also be
notified immediately if applicable.
CYLINDER BANK INSTALLATION INSTRUCTIONS:
CAUTION:
This section contains important information necessary for proper installation of the cylinder
banks. Read it carefully before installing cylinder banks.
Connect the two high pressure inlet valves/header bar assemblies to the CGA connection on each side of the cabinet.
Secure the cylinder extension bar to the support using the U-bolts supplied as part of the assemblies.
Remove the plug and chain assembly on each outlet connection on the cylinder extension bar. Attach the cylinder
pigtails to the header bar connections while ensuring the check valves are operating in the proper direction.
When the medical gas piping system has been tested in accordance with Part 4-5, Testing of NFPA 99, the Amico Economy
Manifold can then be connected to it.
The outlet pipes leading from the Amico Economy Manifold should be connected to their respective pipeline system
connections. The connection to the relief valves should be made with a union (supplied by others) to facilitate changes
if required.
As the threaded joints are installed, an appropriate sealing compound that is suitable for the gas being transmitted shall
be used.
Installation