![amiad Omega 13.5K Скачать руководство пользователя страница 86](http://html.mh-extra.com/html/amiad/omega-13-5k/omega-13-5k_installation-and-operation-manual_2932272086.webp)
O M EG A F i l t e r s – I n s t a l la t io n & O p e r a t io n M a n u a l
P a g e 3 5 o f 3 6
Maintenance
Controlled Tightening/ Loosening of Lid nuts
k. Controlled Tightening/ Loosening of Lid nuts
Tightening
The nuts of all bolts shall be installed finger tight, followed by gradually increasing the bolt force to the
required value in minimum 4 passes as described in Table 3. The bolt sequence shall be in
accordance with the given bolt sequence chart on Figure 34.
The first pass may be done with a hand-spanner, without torque control.
pass 1
pass 2
pass 3
pass 4
pass 5
30%
60%
100%
100%
100%
140
270
440
440
440
Table 3 - Bolting up torque in Nm
Pass 4 shall be in circumferential pattern and be repeated until the nuts do not move;
Pass 5 (optional) time permitting, wait minimum of 4 hrs and repeat Pass 4; this will restore short term
relaxation at ambient conditions.
Loosening
To prevent over yielding of the bolts during dismantling, loosening of the individual bolts shall be done in
a minimum of two passes (50%, 0%) following the given bolt sequence.
Figure 34 – bolt sequence chart
l. BOLTS TIGHTENING
:
All bolts, unless otherwise specified, should be
tightened according to the following Torques
Table:
TORQUE TABLE
Bolt Size
N-M
Lbs-ft
M6 / 1/4”
8
6
M8 / 5/16”
20
15
M10 / 3/8”
40
30
M12 / 1/2"
81
60
M16 / 5/8”
176
130
M20 / 3/4"
340
250
M24 / 1”
680
500
M27
880
650
1-1/2”
1370
1012
20 Bolt Lid
24 Bolt Lid
Содержание Omega 13.5K
Страница 2: ......
Страница 5: ...3 Safety Instructions ...
Страница 10: ...4 Technical Specifications ...
Страница 12: ...5 Drawings ...
Страница 18: ......
Страница 19: ...6 Description of Filter Operation ...
Страница 23: ...7 Control Philosophy ...
Страница 31: ...8 Installation Instructions ...
Страница 35: ...9 Commissioning Start up and First Operation ...
Страница 38: ...10 Part Schedule ...
Страница 42: ...OMEGA Filters Installation Operation Manual Page 5 of 9 Part Schedule Main Omega 13 5K 18K Parts Drawing ...
Страница 52: ...11 Maintenance ...
Страница 88: ...12 Troubleshooting ...
Страница 90: ...13 Amiad Limited Warranty ...
Страница 93: ...Appendix A General Arrangement Drawing GA ...