Doc No. 740123
3
MODEL 8 SERIES WELD HEAD
OPERATION MANUAL
1.0 INTRODUCTION
This manual covers set up and maintenance of the Model 8 series weld heads.
The operator should have a working understanding of the power supply being
used and should understand this manual before operating the weld head.
2.0 UNPACKING
When unpacking the weld head use extreme caution in removing the plastic bag
covering the cable connectors. Tools such a knife of other sharp object can cut
the cables.
3.0 CABLE HOOK UP
CAUTION
Always turn the power supply off before making any cable connections.
The Model 8 series weld heads come supplied with an integral 10ft (3 m) cable.
This cable is NOT connected directly to the power supply. It must be mated to
the power supply via an adapter pig-tail or adapter cable. Extension cables may
also be used. The use of an extension cable does not eliminate the requirement
for an adapter. If an extension cable is used, it is connected between the power
supply and the adapter. After making connections, slide the protective rubber
boots together. See fig. 1.
Fig. 1
Connect the power and ground fittings by pulling the brass ring back
and inserting the male fitting into the female fitting, until it is fully seated.
If it is not fully seated, it will leak water or potentially come apart.
Содержание M8 Series
Страница 1: ...OPERATION MANUAL M8 SERIES WELD HEADS ...