
4
B. Equipment storage and installation requirements.
The equipment should be stored or installed in a shady, normal
temperature, ventilated and dry place.
C. The equipment should be unload and transfer by forklift.
D. SPECIFICATIONS OF CONCRETE
(See Fig. 5)
Specifications of concrete must be adhered to the specification as following.
Failure to do so may result in lift and/or vehicle falling.
1. Concrete must be thickness 7 7/8”(200mm) minimum and without reinforcing
steel bars, and must be totally dry before lift installation.
2. Concrete must be in good condition and must be of test strength 3,500psi
(245kg/cm²) minimum.
3. Floors must be level with no cracks or holes.
E. POWER SUPPLY
The electrical source must be 3kw minimum. The source cable size must be 2.5mm²
and in good condition of contacting with floor.
Fig. 5
Concrete intensity must be 3,500psi
(245kg/cm²)
7
7/
8”
36
Fig.4
Содержание OH-12
Страница 1: ...Two Post Lift Model OH 12 Original...
Страница 4: ...2 Arm Swings View Fig 2 3829mm 2787mm 109 3 4 150 3 4...
Страница 17: ...15 K Lift the carriages up by hand and make them be locked at the same level See Fig 26 Fig 26...
Страница 19: ...17 1 2 Connecting cable for high setting See Fig 28 High Setting Cable 1 Cable 2 Fig 28 Cable 1...
Страница 27: ...25 L1 Motor Power Line 3 4 3 4 A1 Remove this wire before connecting the Limit Switch Fig 39 Fig 38 N 11 12 L...
Страница 28: ...26 IV EXPLODED VIEW Model OH 12 Fig 40...
Страница 34: ...32 4 3 Manual Power unit 071102 220V 60HZ Single Phase Fig 43...