L. Install cables
1.
High setting cable connection
1.1 Take out the carriages plastic cover, cable pass through from the bottom of the
carriages and be pulled out from the open of carriages, then screw the two cable
nuts
(See Fig. 27).
Cable connecting direction
Cable connecting direction
Fig. 27
Screwed the two cable nuts