
Appendix A
A3
CE Installation Supplement
440-0018-731
Sht. 2
of 2
ISSUE
4
3.
Remote Installations
Sensor port must be connected to the transmitter port by one of the
following means:
•
401-16 Probe Filter
•
Coaxial cable run in conduit.
•
Triaxial cable.
4.
Housings
All installations require the sensor and transmitter to be located in
a closed shielded/metal housing (i.e. typically explosion-proof or
weatherproof housings meet this requirement)
5.
Sensor Type/Mounting
In all non-metallic applications the sensor must have a full
concentric shield (i.e. needs to be considered when ordering).
The sensor/sensor condulet must be grounded locally either to a
metal support structure or an equivalent earth ground.
D.
Comments:
Any deviation from these installation requirements should
be reviewed with factory, prior to implementation
These instructions are essential to insure conformity with specified
EC directives.
Содержание ThePoint Series
Страница 4: ...Contents...
Страница 6: ...Section 1...
Страница 28: ...ThePoint Series 22 Section 3...
Страница 36: ...Section 4...
Страница 39: ...Control Drawings 33 Section 5 Control Drawings 5 1 FM FMc Control Drawings...
Страница 40: ...ThePoint Series 34 5 1 FM FMc Control Drawings Continued...
Страница 41: ...Control Drawings 35 5 1 FM FMc Control Drawings Continued...
Страница 42: ...ThePoint Series 36 5 1 FM FMc Control Drawings Continued...
Страница 43: ...Control Drawings 37 5 1 FM FMc Control Drawings Continued...
Страница 44: ...ThePoint Series 38 5 1 FM FMc Control Drawings Continued...
Страница 45: ...Control Drawings 39 5 1 FM FMc Control Drawings Continued...
Страница 46: ...ThePoint Series 40 5 1 FM FMc Control Drawings Continued...
Страница 47: ...Control Drawings 41 5 1 FM FMc Control Drawings Continued...
Страница 48: ...ThePoint Series 42 5 1 FM FMc Control Drawings Continued...
Страница 49: ...Control Drawings 43 5 1 FM FMc Control Drawings Continued...
Страница 50: ...ThePoint Series 44 5 2 ATEX Control Drawings...
Страница 51: ...Control Drawings 45 5 2 ATEX Control Drawings Continued...
Страница 52: ...ThePoint Series 46 5 2 ATEX Control Drawings Continued...
Страница 55: ...Control Drawings 49 5 2 ATEX Control Drawings Continued...
Страница 56: ...ThePoint Series 50 5 3 Heavy Duty Spark Protection...
Страница 57: ...Control Drawings 51 5 3 Heavy Duty Spark Protection Continued...
Страница 58: ...ThePoint Series 52 5 4 Adding a Padded Capacitor...
Страница 59: ...Control Drawings 53 5 4 Adding a Padded Capacitor Continued...
Страница 60: ...ThePoint Series 54 5 4 Adding a Padded Capacitor Continued...
Страница 61: ...Control Drawings 55 5 5 Dual Seal Assembly for 700 Series Sensing Elements...
Страница 62: ...ThePoint Series 56 5 5 Dual Seal Assembly Continued...
Страница 63: ...Control Drawings 57 5 5 Dual Seal Assembly Continued...
Страница 64: ...Appendix A...
Страница 69: ......