5
START-UP
Warning
:
At high temperatures, the pump may be extremely hot. Do not
touch it.
Priming:
Before startup, or if the pump has been drained, the pump must be filled with
liquid and vented.
Proceed as follows:
Close the discharge isolating valve and bypass valve.
(See System Design drawing)
Remove the priming plug in the pump sleeve. (See Plug drawing).
Slowly open the suction valve (See System Design drawing), in the inlet
pipe until a steady stream of liquid runs out of the priming port.
Warning
:
The escaping liquid may be very hot. Therefore, care must be
taken to ensure that the liquid does not cause personal injury or
damage to other components
.
Replace priming plug and tighten securely.
Start the pump and slowly open the discharge valve until it is fully open.
Completely open the suction valve in the inlet pipe.
Plug Drawing
Содержание CHIE VARIABLE SPEED BOOSTER PUMP SYSTEM
Страница 6: ...4 SYSTEM DESIGN DRAWING...
Страница 13: ...11 REPLACEMENT PARTS DRAWING...