3
When the pump is switched on by way of the mains, it will start after
approx. 5 seconds.
When the pump is started/stopped by way of an external on/off switch, it
will start immediately.
Note
:
These steps have been already completed at assembly for
this product. For your information:
The connection terminals inside the pump terminal box for
the pressure sensor and blade or service disconnect cord
are shown in the figure below with installation directions
listed.
Warning
:
Never make any connections in the pump terminal box
unless the electricity supply has been switched off for at
least 5 minutes.
Pressure Sensor Installation
: With the protective cover off, bring the wire
from the pressure sensor into the motor through the strain relief in the middle.
Connect the yellow-green wire to terminal 6, the blue wire to terminal 7 and the
brown wire to terminal 8. Clip the remaining wires as they are not used. Make
sure remaining wires are isolated from ground. Replace the access cover after
all connections have been made.
Blade or Service Disconnect Cord Installation
: With the protective cover off,
bring the line cord through the strain relief furthest from the pump inlet.
Terminate the white wire into the connection marked N, the green wire to
ground terminal and the black wire to L. Replace the grey protective cover after
all connections have been made.
Содержание CHIE VARIABLE SPEED BOOSTER PUMP SYSTEM
Страница 6: ...4 SYSTEM DESIGN DRAWING...
Страница 13: ...11 REPLACEMENT PARTS DRAWING...