8
PLATFORM INSTALLATION
a) Install platform on rail by inserting Charriot #2 in the rail. Make sure to
leave about 1/8’’ gap between chariot #4 wheel bolts heads and the inside
face of the rail.
b) Slide in chariot #1 between back of platform and supporting wall
c) Slide the bolts in the arc shaped slots
d) Make sure all wheels are running on the rail surface, otherwise adjust
chariot accordingly. Tight in place and add cotter pins on each bolt.
e) Attach the lifting chain to the safety brake using the #50 quick link
provided with the chain.
f) Install the upper mechanical stop.
g) Remove the brake lock screw. ( Front panel will not fit otherwise )
h) Make all electrical connections as per schemes BEC03 9X9 au BEC04Z3
Содержание Titan Incline Lift
Страница 1: ...INSTALLATION Titan Incline Lift ...
Страница 8: ...9 UPPER MECHANICAL STOP ...
Страница 11: ...12 INSPECTION Titan ...
Страница 13: ...14 MANUAL MOVING OF THE PLATFORM ...
Страница 20: ...21 MAINTENANCE Titan Incline ...
Страница 23: ...24 USER MANUAL Titan Incline Lift ...
Страница 25: ...26 RATING PLATE ...
Страница 28: ...29 MANUAL MOVING OF THE PLATFORM ...