7
GUIDE RAIL INSTALLATION
(STUD WALL)
Guide rail will be shipped already assembled with spacers or screwed on
plywood. The installer needs to join he column to the rail itself using the metal
bracket ‘’ RACCORD’’ already installed on the column.
a) Place the rail assembly on the wall
b) Screw the rail ‘’Raccord’’ to the upper rail end
c) Locate anchoring structure in the supporting wall
d) Screw each Rail into each anchoring structure
e) Use only no.12 wood screw for wooden stud wall.
f) Use only ¼-20 UNC for steel structure.
g) Reinstall metal covers
Anchoring Structure Example
Содержание Titan Incline Lift
Страница 1: ...INSTALLATION Titan Incline Lift ...
Страница 8: ...9 UPPER MECHANICAL STOP ...
Страница 11: ...12 INSPECTION Titan ...
Страница 13: ...14 MANUAL MOVING OF THE PLATFORM ...
Страница 20: ...21 MAINTENANCE Titan Incline ...
Страница 23: ...24 USER MANUAL Titan Incline Lift ...
Страница 25: ...26 RATING PLATE ...
Страница 28: ...29 MANUAL MOVING OF THE PLATFORM ...