19
DOWN CONTACTOR (M2)
a) Install a min 18AWG jumper between terminal 60 and 66. This will
apply 24Vdc directly on the M2 coil
b) Call for an lower landing, after 1.5 sec, the controller should code à fault
c) Reset the controller by pressing Z4 on the PLC
d) Call for a lower landing and press the CAB E-stop, Lift should stall
immediately.
e) Reset the controller by pressing Z4 on the PLC
f) Call for a lower landing and activate the upper safety flap the same way it
would hit an obstacle by moving downward.
g) Lift should stall and code à fault
h) Remove jumper between terminals 60 and 66.
i) Reset controller by pressing Z4 on the PLC
j) Remove wire from terminal 63
k) Call for an downward move , lift should stall after 0.5 sec, and code a
fault
l) Reset controller by pressing Z4 on the PLC
m)
Reconnect wire to terminal 63
n) Reset controller by pressing Z4 on the PLC
Содержание Titan Incline Lift
Страница 1: ...INSTALLATION Titan Incline Lift ...
Страница 8: ...9 UPPER MECHANICAL STOP ...
Страница 11: ...12 INSPECTION Titan ...
Страница 13: ...14 MANUAL MOVING OF THE PLATFORM ...
Страница 20: ...21 MAINTENANCE Titan Incline ...
Страница 23: ...24 USER MANUAL Titan Incline Lift ...
Страница 25: ...26 RATING PLATE ...
Страница 28: ...29 MANUAL MOVING OF THE PLATFORM ...