11
FLOOR
a) Install the (gas spring or linear actuator)** on the floor rocker
b) Adjust the floor level with ½ nominal weight (250 LBS)
c) Adjust all floor level switches so that a 15˚ will open the circuit
**NOTE:
MANUAL ACTION VEHICULE REQUIRE GAS SPRING
AUTOMATIC ACTION REQUIRE LINEAR ACTUATOR
FINALIZING
a) Install the lower call station
b) Rout the electrical power to the cut off
c) Install screw covers on rails
d) Install front platform cover
Содержание Titan Incline Lift
Страница 1: ...INSTALLATION Titan Incline Lift ...
Страница 8: ...9 UPPER MECHANICAL STOP ...
Страница 11: ...12 INSPECTION Titan ...
Страница 13: ...14 MANUAL MOVING OF THE PLATFORM ...
Страница 20: ...21 MAINTENANCE Titan Incline ...
Страница 23: ...24 USER MANUAL Titan Incline Lift ...
Страница 25: ...26 RATING PLATE ...
Страница 28: ...29 MANUAL MOVING OF THE PLATFORM ...