4
Fig. 6
Fig. 6a
Fig. 6b
Fig. 6c
3
4 INSTALL VACUUM BREAKER AND
FLUSH CONNECTIONS; Fig. 6
4
1.
Place the SPUD FLANGE
(1)
over the spud on the
Fixture.
Fig. 6.
2.
Thread SPUD COUPLING NUT
(2)
onto Spud. Make
sure SEAL WASHER
(4)
and FRICTION WASHER
(3)
are installed. Do not tighten fully.
Fig. 6.
3
. Remove the COUPLING NUTS
(6, 6a)
from the
CHROME ELBOW
(5)
. Make sure you have a TAPERED
RUBBER WASHER
(7)
, PLASTIC SUPPORT
(8)
and
SQUARE SEAL WASHER
(9)
.
Fig. 6a.
4.
Install the SQUARE SEAL WASHER
(9)
onto the
PLASTIC SUPPORT
(8)
if not already installed.
Insert
the PLASTIC SUPPORT
(8)
into the DOWN TUBE
(10).
Slide the COUPLING NUT
(6)
onto the DOWN TUBE
(10)
.
Connect the COUPLING NUT
(6)
to the
CHROME ELBOW
(5)
and tighten fully. Insert the
DOWN TUBE
(10)
with CHROME ELBOW
(5)
into the
SPUD COUPLING NUT
(2)
and push it down. Do not
tighten fully.
Fig. 6a. Note:
If center line of ELBOW
(5) cannot be adjusted to line up with hole in wall,
then cut the DOWN TUBE (10) as required.
5.
Measure and cut the HORIZONTAL TUBE
(11)
to
length required.
Important:
Make sure that there is a
minimum of 1-1/4" for engagement with elbow when
making your measurement.
Fig. 6b.
6.
Remove the COUPLING NUT
(14)
from BRASS
ELBOW
(12)
and slide it onto the HORIZONTAL
TUBE
(11).
Install the SQUARE SEAL WASHER
(13)
onto the PLASTIC SUPPORT
(15)
if not already
installed. Insert the PLASTIC SUPPORT
(15)
into the
HORIZONTAL TUBE
(11).
Connect the COUPLING
NUT
(14)
to the BRASS ELBOW
(12)
and tighten fully.
Fig. 6b.
7.
From behind the wall install the ELBOW AND TUBE
ASSEMBLY
(12, 11)
through the hole in the wall. Install
WALL ESCUTCHEON
(16)
onto HORIZONTAL TUBE
(11)
.
Assemble the COUPLING NUT
(6a)
and TAPERED
RUBBER WASHER
(7)
in the CHROME ELBOW
(5)
onto
the HORIZONTAL TUBE
(11)
.
Push the HORIZONTAL
TUBE
(11)
into the CHROME ELBOW
(5)
. Tighten
COUPLING NUT
(6a)
but not fully.
Fig. 6b.
8. For back spud installations:
Follow steps #1 and #2
to install the spud coupling kit. Push the HORIZONTAL
TUBE
(11)
into the spud connection on the back of the
fixture. Do not tighten fully. If spud coupling kit is not
required install HORIZONTAL TUBE
(11)
into back
spud on fixture and hand tighten.
Fig. 6b.
9.
All installations:
If required cut scored VACUUM
BREAKER PIPE
(17)
to fit, leave a minimum of 1-1/4"
(32mm) of pipe to ensure engagement with
compression coupling. Assemble the COUPLING NUT
(18)
and TAPERED RUBBER WASHER
(19)
in the
BRASS ELBOW
(12)
onto the VACUUM BREAKER
PIPE
(17).
Install VACUUM BREAKER PIPE
(17)
into
BRASS ELBOW
(12)
and hand tighten COUPLING
NUT
(18)
.
Fig. 6c.
Note:
If cutting VACUUM BREAKER PIPE (16) to
size, note that Critical Line (C/L) on Vacuum
Breaker must typically be 6
"
(152mm) above fixture.
Consult Code for details.
1
2
3
4
1-1/2" TOP SPUD
9
14
16
12
11
15
5
7
6a
13
6a
8
7
5
6
10
FLANGE END UP
FLANGE END
11
18
19
19
17
TOP SPUD
INSTALLATION
BACK SPUD
INSTALLATION
BACK SPUD
INSTALLATION
TOP SPUD
INSTALLATION
2
M968550 REV. 1.5
TAPERED SIDE
TAPERED
SIDE
12
TAPERED SIDE UP
TAPERED
SIDE UP