background image

3

5

7

6

T O P

1. 

Remove FRONT PANEL. 

For removing front panel 

see Step 9 for instructions.

2.

 Remove the four COVER SCREWS 

(1)

 and COVER 

(2)

 from ELECTRICAL BOX 

(3)

Fig. 16.

 

3.

 Disconnect GREY SENSOR WIRE 

(4)

 from CIRCUIT 

BOARD 

(5)

.

4.

 Remove CIRCUIT BOARD 

(5)

 from ELECTRICAL 

BOX 

(3)

Fig. 16a.

 

   

5.

 With your thumbs, spread the two TABS 

(6)

 on 

battery holder apart and remove the BATTERY 

(7)

.

2.

 Install NEW BATTERY 

(7)

 into holder on DC circuit 

board. Press BATTERY 

(7)

 down (contacts facing 

downward) into position until TABS 

(6)

 lock BATTERY 

(7)

 

into place. 

6.

 Install CUIRCUIT BOARD 

(5)

 and connect GREY 

SENSOR WIRE 

(4).

 

               

7.

 Install COVER 

(2)

 and SCREWS 

(1)

.

8. 

Replace and FRONT PANEL. 

See Step 9 for 

instructions on installing front panel.

10

     HOW TO INSTALL NEW BATTERY;
Fig. 16

13

14

Fig. 16

Fig. 16a

Fig. 17

1

4

2

3

5

T O P

CLOCKWISE

 CLOSES

CONTROL STOP

COUNTER-CLOCKWISE

OPENS CONTROL STOP

IMPORTANT:

 

To avoid overflowing, the SUPPLY STOP 

(2) must never be opened to the point where the flow 
from the valve exceeds the flow capacity of the 
fixture. The fixture must be able to handle a 
continuous flow in case of a flush valve failure.
Valve is designed to provide stated flush volume with 
a 25 GPM flow rate.

1.

 After installation is complete, peel off the PROTECTIVE 

FILM 

(1)

 from the sensor. Standing to one side, block the 

sensor with your hand for 10 seconds. 

Remove your hand 

and listen for audible “click” from within the valve. 

2.

 Turn on SUPPLY STOP 

(2)

 1/4 turn to 1/2 turn(CCW) 

and test for leaks. 

Note:

 

Unit may flush for 

approximately 5 to 10 sec. when water is first turned 
on. If flow persists, turn water off and repeat step #1 
above. 

3.

 Actuate the FLUSH VALVE:

     A) Cover sensor with hand for 10 seconds. 

             NOTE: Stand outside of sensor detection aera.

     B) Remove hand from in front of the sensor; unit will
          flush in approximately 3 seconds.

4.

 Adjust SUPPLY STOP 

(2)

 after each flush until the 

stated flush volume is achieved, no splashing occurs and 
the fixture is properly cleansed. 

ADJUST SUPPLY STOP; Fig. 17

1

2

M968550 REV. 1.5

Содержание SELECTRONIC 6065.22 Series

Страница 1: ...8550 REV 1 5 To learn more about American Standard Faucets visit our website at www americanstandard us com or U S customer s e mail us at faucetsupport americanstandard com For Parts Service Warranty...

Страница 2: ...Plate with Sensor 4 Supply Stop 5 Sweat Solder Adapter 6 Manual Override Hoses 7a Vacuum Breaker Flush Connection Wall Mount Back Spud 7b Vacuum Breaker Flush Connection Floor Mount Back Spud T O P 8...

Страница 3: ...quate volume of water for each fixture 2 Fig 1 Roughing in Dimensions GENERAL DESCRIPTION 10 Concealed Flushometer for 1 1 2 Spud Fixtures SELECTRONIC PROXIMITY TOILET FLUSH VALVE Exclusive self clean...

Страница 4: ...1 and turn off water supply line FLUSH OUT SUPPLY LINES Fig 5 3 FOR HOLE LOCATION OF SUPPLY ON BACK INLET FIXTURES REFER TO FIXTURE BEING INSTALLED FOR CORRECT HEIGHT FROM FINISHED FLOOR 127mm 5 406m...

Страница 5: ...11 Connect the COUPLING NUT 14 to the BRASS ELBOW 12 and tighten fully Fig 6b 7 From behind the wall install the ELBOW AND TUBE ASSEMBLY 12 11 through the hole in the wall Install WALL ESCUTCHEON 16 o...

Страница 6: ...ASKET 10 is installed Note There is a 13mm 6mm 1 2 1 4 tolerance for the 121mm 4 3 4 dimension Fig 9 2 Pull the VACUUM BREAKER TUBE 7 up to meet the threaded FLUSH VALVE CONNECTION 8 and hand tighten...

Страница 7: ...T PLUG 8a Push SPLIT PLUG 8a into POWER SUPPLY GROMMET 8 to seal Fig 10b 6 Insert POWER SUPPLY CONNECTOR 9 into RECEPTOR 11 on CIRCUIT BOARD 3 Install CIRCUIT BOARD 3 into ELECTRICAL BOX 4 Fig 10b 7 I...

Страница 8: ...OR 8 into CIRCUIT BOARD RECEPTOR 10 slot Fig 11b 9 Replace COVER 2 Tighten COVER SCREWS 1 firmly 7 Fig 11a Fig 11b Fig 12 1 2 3 4 6 11 2 11a 8 9 1 CONNECT FRONT PANEL TO ELECTRICAL BOX DC POWER BATTER...

Страница 9: ...E SWITCH 3 CONNECT OVERRIDE HOSES AC DC POWER Fig 13 10 1 Push the RED WIRE CONNECTOR 1 onto the SOLENOID PIN 2 with Red Stripe Push the BLACK WIRE CONNECTOR 3 onto the other SOLENOID PIN 4 Push the w...

Страница 10: ...2 ELECTRICAL BOX 3 remove ROUND KNOCK OUT 11 on the bottom of the box by pressing a flathead screwdriver into the center of the ROUND KNOCK OUT 11 Fig 15b 8 Insert additional SENSOR WIRE GROMMET 12 in...

Страница 11: ...STOP 2 must never be opened to the point where the flow from the valve exceeds the flow capacity of the fixture The fixture must be able to handle a continuous flow in case of a flush valve failure V...

Страница 12: ...stops blinking and stays ON move your hand to the desired position from sensor detection zone 15 3 4 to 31 1 2 400 to 800mm and hold in place until the LED 6 begins to blink again Fig 19a Note Maximum...

Страница 13: ...RST 5 SECONDS NO REPLACE SOLENOID KIT RETRY AUTOMATIC FLUSH WAS IT SUCCESSFUL YES 1 COVER SENSOR FOR 10 SECONDS 2 UNCOVER SENSOR FOR 10 SECONDS REPLACE BATTERY SEE STEP 13 page 10 in manual MANUAL VAL...

Страница 14: ...8 0020A SPUD COUPLING M962751 0070A VACUUM BREAKER ASSEMBLY M962751 0070A VACUUM BREAKER ASSEMBLY A950487 0070A CIRCUIT BOARD DC A950489 0070A CIRCUIT BOARD AC MULTI AC M950169 0070A POWER SUPPLY A922...

Отзывы: