AK INSTALLATION AND SERVICE INSTRUCTIONS
4211-1551 06/18/18 Technical Support: 1-425-951-1120 1-800-363-0251 [email protected] Page
10
of
20
SECTION 3: PLUMBING INSTRUCTIONS
(continued)
Diagram 3a
Diagram 3b
Note
: See Diagram 6 for a typical installation. Additional steam heads may be added to any installation to reduce
steam noise or to provide more steam dispersion around a large room.
For large AK14 steamers, we recommend
using 2 steam heads to reduce the noise level while steaming.
Note
:
if steam vents are too close to other surfaces, the steam may be cooled and the surfaces damaged.
d)
At the steam room
: Drill/prepare a 1-3/8” (35 mm) hole for the
steam line entry. Center the 1/2" copper steam pipe in the hole.
See Diagram 4.
Terminate the steam line with a 1/2" NPT male adapter.
Stub the line out into the room 3/8” (9,5 mm) from the finished
surface.
Secure the steam line to a structural member.
3.
INSTALL STEAM HEAD INSULATOR:
Fill in gap (using 100%
Silicone caulk between steam pipe and finished wall surface at point of
entry (see Diagram 4). Apply silicone caulk to the finished wall side of
the steam head insulator (see Diagram 5) and screw on hand tight until
it is flush with the wall with the opening pointing down. If a hand tight fit
does not align with the opening pointing down, use Teflon tape on the
steam line threads to adjust the fit.
DIAGRAM 4
3/8”
(9,5 mm)
FROM
WALL
1/2 NPT
1-3/8”
(35 mm)
HOLE