background image

 

20 

5.4    Mechanical inspection 

Inspection 

It is recommended to physically check AIS SART routinely to verify:   

 

The battery expiry date has not been exceeded.   

 

Evidence of any damage to the main body, Wall mounted bracket, Carry bag, Extension 

Pole, Buoyant Lanyard.   

 

Evidence of dirt; to clean AIS SART only using fresh water then wipe dry. 

WARNING 

– Do not use any chemical liquid on AIS SART or its accessories. 

 

5.5    Anti-tamper Cap replacement 

The AIS SART has a Red anti-tamper protection cap that will be broken during activation. An 

AIS SART is a single use device, once activated and before returning it to storage a 

maintenance service battery replacement will be required.     

NOTE 

– To replace the anti-tamper cap and battery, please contact your local approved 

service agent. 

 

5.6    Battery replacement 

The battery pack should be replaced every 6 years or when it reaches its expiry date or if the 

AIS SART has been activated.   

The battery pack expiry date is marked on the AIS SART main body label. The battery expiry 

date should be checked regularly.   

Lithium batteries have special disposal requirements. Never incinerate a lithium battery. Never 

dispose of one at sea. Your approved service agent will be able to deal with battery disposal. 

 

NOTE 

– It is recommended that battery change should be performed by an authorized 

service agent in order that a complete assessment and integrity check can be 

performed. To replace a battery pack, please contact your local approved service 

agent. 

 

 

 

 

 

Содержание AIS SART PLOMO-500

Страница 1: ......

Страница 2: ...ur AIS products to satisfy all customers needs information in this document is subject to change without notice AMEC does not make any representations or warranties implied or otherwise regarding the...

Страница 3: ...ur nearest distributor for service DO NOT DISASSEMBLE OR MODIFY THE EQUIPMENT Improper disassemble or modification could cause electrical shocks fire or personal injury WARNING DO NOT PLACE ANY LIQUID...

Страница 4: ...tion or maintenance the equipment will function properly at its optimum The operation instructions contained in this manual is applied only to PLOMO 500 AMEC and the authorized local agent dealer will...

Страница 5: ...s 13 3 3 Deployment guidelines 14 3 4 Mounting outside a canopy life raft 15 3 5 Mounting inside a canopy life raft 15 3 6 Deactivation Process 16 4 AIS SART TARGET VISUALIZATION 17 5 1 Servicing sche...

Страница 6: ...n AIS SART can be deployed on board or in the water GMDSS vessels from 300 to 500 GRT are required to carry one SART and vessels over 500 GRT are required to carry two and since 2010 AIS SARTs have be...

Страница 7: ...mounted using the wall mount bracket provided The carry bag offers additional protection to the AIS SART both for storage and when carrying on to a survival craft Once assembled and ready for deploym...

Страница 8: ...9 Figure 3 AIS SART key features description...

Страница 9: ...ept manual Table 2 1 Standard equipment list No Description Qty 1 AMEC PLOMO 500 AIS SART 1 2 Manual 1 3 Installation Kit Carry Bag 1 1M Extension Pole 1 Wall Mount Bracket 1 10M buoyant lanyard 1 Scr...

Страница 10: ...cket to the ships wall using marine grade stainless steel screws or bolts length is dependent upon application Bolts should be secured with either stainless steel locking nuts or stainless steel nuts...

Страница 11: ...tuations of imminent danger 3 1 Abandon ship Figure 6 Deployment process Step 1 Lift Carry Bag out of bracket on the wall Step 2 Bring Carry Bag and jump into a Life Boat Step 3 Open Carry Bag and tak...

Страница 12: ...NOT COVER GNSS AREA WHILE ACTIVE see Figure 7 Figure 7 GPS GNSS AREA Location NOTE 1 The GNSS receiver is activated cold start when ON is depressed and the Orange LED indicator will initially flash c...

Страница 13: ...SART is deployed Tie the securing lanyard to the survival craft to avoid loss of the AIS SART activate and deploy the AIS SART Figure 8 deployment Step 1 Release buoyant lanyard secured to top of the...

Страница 14: ...ttom of the support pole within the locating pocket Secure the pole to the canopy support Depending on the type of survival craft the mounting pole can also be located on the outboard side of the surv...

Страница 15: ...tiate power off 2 Keep holding TEST until the ON LED stops flashing The AIS SART is then deactivated Figure 10 Deactivation NOTE After de activating all LEDs shall be off If any LED is still flashing...

Страница 16: ...d the TX ID will be display on the vessels navigation display or AIS receiver equipment A SELF TEST mode generated message is displayed as SART TEST The live emergency transmission is displayed as SAR...

Страница 17: ...damage or wear and tear according to the manufacturer s instructions please refer to www alltekmarine com for further details 5 2 Self test inspection It is recommended to self test the AIS SART every...

Страница 18: ...er usage warning 1 long Green AIS SART complete transmission and light off after long green color flash automatically Check your chart plotter ECDIS if the SAR messages are received and whether the me...

Страница 19: ...ery replacement will be required NOTE To replace the anti tamper cap and battery please contact your local approved service agent 5 6 Battery replacement The battery pack should be replaced every 6 ye...

Страница 20: ...IATA Packing Instruction for Air 970 Section II Packing Instruction for Road Sea P903 Special Provision 188 For further information please refer to the Alltek Marine website www alltekmarine com 5 8 G...

Страница 21: ...Operating Life Storage Service Primary Lithium not rechargeable 96 hours minimum 6 years Replaceable Please refer to Section 4 4 Replacement Receiving Channels Acquisition Sensitivity Tracking Sensiti...

Страница 22: ...Package 70 mm 300 mm 283g Battery included 1050mm Extended 300g 1 08kg CARRY MOUNTING Carry Bag Wall Mount Operating Temperature Storage Temperature Waterproof Buoyancy Exterior Finish Compass Safe Di...

Страница 23: ...24 6 2 Dimensions PLOMO 500 Front View Figure 5 2 1 PLOMO 500 front view PLOMO 500 Side View Figure 5 2 2 PLOMO 500 side view Pole Front View Figure 5 2 3 PLOMO 500 pole front view...

Страница 24: ...25 Pole Side View Figure 5 2 4 PLOMO 500 pole side view Bag Front View Figure 5 2 5 PLOMO 500 bag side view Bag Side View Figure 5 2 6 PLOMO 500 bag side view...

Страница 25: ...airs or replacement will be the sole remedy of the customer under this Warranty Standard Warranty Service To qualify for standard warranty service the product must be returned to a AMEC certified serv...

Страница 26: ...ising advertising literature or on the Internet TO THE EXTENT PERMITTED BY APPLICABLE LAW THE FOREGOING WARRANTY IS AMEC S SOLE WARRANTY AND IS APPLICABLE ONLY TO NEW PRODUCTS PURCHASED WORLDWIDE THE...

Страница 27: ...create any additional warranty obligations increase the scope or otherwise modify in any manner the terms of this Warranty All AMEC products sold or provided hereunder are merely aids to navigation It...

Отзывы: