Doc No. 700025 Page 23 of 32
3. Commissioning Instructions.
These appliances should be commissioned by a qualified engineer.
3.1 Tools
Required.
The following tools & equipment are advisable
to complete the tasks laid out in this manual.
Suitable alternative tools may be used.
Small Flat
Head
Screwdriver
Manometer
Pozidrive
Screwdriver
Leather
Faced
Gloves
4mm
Allen
Key
10/12mm
Spanners
Large Adjustable
Spanners or 22, 26 &
27mm Spanners for
fitting Of Gas Flex.
13mm
Socket
Wrench with
Extension
Check installation has
been carried out to these
instructions.
NO
YES
Ensure gas and electricity
supplies are isolated.
Disconnect gas hose from
burner
Remove burner from tube and inspect burner head.
(See servicing instructions)
Replace burner on tube
and secure.
Open control housing and
check that all components
are securely fastened.
Reconnect gas hose.
Open isolating valve.
Check soundness.
A successful ignition is indicated by
the amber Lo and Hi fire lights
illuminating and remaining
illuminated.
The heater should now
run through its start up
sequence and ignite.
Turn off power and check
that all components are
securely fastened.
Has the
burner lit?
Check operation on flame failure.
Check gas pressure.
Check
gas pressure
Hi and Lo fire.
Check operation of air
pressure switch.
Check thermostat is set to
call for maximum heat.
Switch on electrical supply.
The red neon should now
be illuminated. If restarting
heater a delay of 15s
should be allowed.
Leave the instructions
with a responsible
person.
Close control housing
Gas Valve adjustment
Injector pressure
test point.
Gas inlet test point
Low set point
regulator
High set point
regulator
(10mm spanner
required)