1.6 Vent Requirements and Details 

 

1.6.1 Unvented units 

 
Heaters  may  be  installed  without  a  vent          
providing the governing building codes are met 
and  consideration  is  properly  given  to          
possibilities of condensation on cold surfaces. 
 
Installation 

shall 

meet 

the 

following                

requirements when unvented: 
 



Internal volume of the heated room must 
be greater than 214cu.ft. per 100 BTU 
per hour of heaters installed. 

OR 



Natural or mechanical means shall be 
provided to supply and exhaust at least 4 
CFM per 1000 BTU per hour input of  
installed heaters. 



Combustion gasses shall not impinge on 
combustible materials. 

 

1.6.2 Vertical venting 

 
The heater can be installed with a vertical vent. 
 
All vent piping should be adequately supported 
from the building structure and terminated with 
an approved terminal. 

The 

maximum          

recommended vent length is 25ft (7.6m) with 
a maximum of two 90° elbows

.  All             

connections should be properly sealed.  
(refer to fig. 8a) 
 

1.6.3 Horizontal venting 

 
Individual units can be vented horizontally 
through side walls. Recommended terminals 
are part numbers V0700   for 4” and V0800  for 
6”. 
 
Distances from adjacent public walkways, 

 

 

 

adjacent buildings, opening windows and 

 

building openings, consistent with the 

National 

Fuel Gas Code, ANSI Z223.1/NFPA 54 

or the 

Natural Gas and Propane Installation Code, 
CSA B149.1. 
 

Maximum length of vent is 25ft (7.6m) with two 
- 90° elbows.  
 
Runs of 12ft (3.6m) or shorter can use 
4” (101mm) diameter vent. runs over 12ft 
(3.6m) should use 6” (152mm) vent pipe. 
 
Any portion of vent that passes through a     
combustible wall must be insulated, or use an 
approved insulating thimble. 
 

Standard vent terminals must extend at least 
6” (152mm) from the wall and at least 
24” (609mm) from any combustible overhang. 
Protect the building   material from degradation 
by the vent

 

gases. 

 
Vent  joints  should  be  sealed  and  secured      
according to the vent manufactures instructions. 
Should condensation occur the vent should be       
shortened or insulated. 
 
The terminal should be at least 3ft (0.91m) away 
from any air intake to the building. 
 
If the heater is equipped with ducted combustion 
air, the vent terminal must be at least 3ft 
(0.91m) away from the air inlet and located  
higher than the inlet. 
 
The vent terminal must be installed at a suitable 
height above the ground to prevent blockage by 
snow. 
 

1.7  Fresh Air Intake 

 
Whenever the heater is installed in locations 
where airborne dust or other pollutants are    
present, a fresh air supply should be ducted to 
the burner. 
 
A fresh air duct of 4” (101mm) diameter should 
be installed from the fresh air to the air intake     
connection on the burner housing. A flexible 
jointing piece should be installed at the burner 
connection  with  hose  clamps  to  facilitate       
expansion and contraction. 
 
The maximum recommended length air duct is 
25ft (7.6m) and the maximum number of elbows 
is two. The minimum length is 18” (456mm). 
 
The  location of the fresh air duct inlet must be 
where it will receive dust free clean air. An inlet 
cap with bird screen must be fitted at the inlet of 
the duct. If the duct inlet is located above the 
roof the underside of the inlet terminal must be 
at least 2ft (0.61m) above roof level and at least 
10” (254mm) above any projection on the roof 
within 7ft (2.1m) of the inlet.  Intake pipe, fittings 
and  sealant  are  not  furnished  by  the            
manufacturer. Refer to figs. 8c & 8d.

 

 

Содержание VCLU 100-S40

Страница 1: ...s Fired Tubular Radiant Low Intensity Infrared Heater 700111 WARNING Improper installation adjustment alteration service or maintenance can cause property damage injury or death Read the installation...

Страница 2: ...PA 88B or the Canadian Natural Gas and Propane 1 1 Health and Safety A Heater is intended for heating outdoor or non residential indoor spaces and should only be installed where flammable gases or vap...

Страница 3: ...rength or suitability of roof steelwork to which heaters are to be suspended please refer to a Consultant Architect or owner of the building It is recommended that the heater is raised to its final po...

Страница 4: ...ight to maintain required clearance to combustibles Such signs must either be posted adjacent to the heater thermostats or in the absence of such thermostats in a conspicuous location Refer to mountin...

Страница 5: ...ies C2 C1 A B1 B B A E D2 0 to 55 D1 Ensure that there is adequate provision in the building for combustion and ventilation air supply Installation must meet minimum requirements and appliciable codes...

Страница 6: ...e to expansion WARNING Before installation check that the local distribution conditions nature of gas and pressure and adjustment of the appliance are compatible Figure 3 Correct orientation of Ball V...

Страница 7: ...he main electrical disconnect There may be more than one disconnect switch Lock out and tag switch with a suitable warning label Electrical shock can cause personal injury or death Figure 5a External...

Страница 8: ...nals as shown in the diagram opposite Link F2 F1 R C W1 24V AC Terminals 120V AC Fan Terminals 120V AC Supply 24V AC Single Stage Thermostat Ext R C W1 Burner 1 E N L N E BK R BL BK G W KEY BK BLACK B...

Страница 9: ...z AC external supply is connected to burner Additional wiring is required to install a thermostat and or time clock W ire specification 18 AW G 1 0mm Tri rated 105 C Pressure Switch 120v 24VAC 60Hz Tr...

Страница 10: ...onal wiring is required to install a thermostat and or time clock Wire specification 18 AWG 1 0mm Tri rated 105 C Pressure Switch 120V 24VAC 60Hz Transformer Power ON red BK R Y O BR GR BL KEY BL BLUE...

Страница 11: ...ulated or use an approved insulating thimble Standard vent terminals must extend at least 6 152mm from the wall and at least 24 609mm from any combustible overhang Protect the building material from d...

Страница 12: ...14mm MIN CENTERS ENSURE ALL JOINTS ARE SEALED APPROVED CAT 3 VENT PIPE VENT ELBOWS REFLECTOR END OF RADIANT TUBE VENT ADAPTOR ELBOW 12 0 3 66m 12 0 3 66m APPROXIMATE MAXIMUM DIMENSIONS CODE APPROVED V...

Страница 13: ...0 41 500 41 500 10 3 0 30 9 1 20 6 1 20 6 1 N A Appliances can be installed up to 10 000 ft in the USA Altitude conversion kits are available on request USA Natural Gas 0 2000 ft 0 610m Size 60 80 100...

Страница 14: ...1631 32 Pressure Switch Part No 201508 201697 201676 USA CANADA LP Gas 0 2000 ft 0 610m MODEL 40 60 80 100 125 150 170 200 Burner Orifice Plate Part No 201063 75 201063 74 201063 72 201063 56 201063 5...

Страница 15: ...ed up to 10 000 ft in the USA Altitude conversion kits are available on request Natural Gas 0 2000 ft 0 610m Size 60 80 100 125 150 170 200 WC Hi 4 2 3 9 4 9 4 5 4 4 4 0 3 5 USA WC Lo 2 4 2 3 2 1 2 7...

Страница 16: ...201007 18 201007 19 201007 23 201007 29 201631 28 201631 32 Pressure Switch Part No 201508 201697 201676 USA CANADA LP Gas 0 2000 ft 0 610m MODEL 40 60 80 100 125 150 170 200 Burner Orifice Plate Part...

Страница 17: ...EL U TUBE STRAIGHT TUBE U20 U40 U60 S10 S20 S30 S40 S50 S60 S70 60 80 100 125 150 170 200 40 Options Not available on LP Gas 1 All standard units fitted with unvented vent natural gas and stainless st...

Страница 18: ...urbulators where fitted Insert turbulator into correct tube as indicated in the assembly drawings PLEASE READ this section prior to assembly to familiarize yourself with the components and tools you r...

Страница 19: ...Reflectors are fixed at point F with a reflector support bracket and reflectors are held in position with fixing screws Fixed and sliding joints alternate along the heater at the spacing s indicated o...

Страница 20: ...d with the end cap flanges facing inwards Fasten to reflector using the four Z clips Note For high wind outdoor applications use additional drill screws to secure end cap to the reflector End Cap Bend...

Страница 21: ...l supplies as described in sections 1 4 and 1 5 2 2 9 Heater Configurations The sketches shown on the following page show various heater configurations for the model series dependant on heater length...

Страница 22: ...ed at a distance of at least 50 of the total heat exchanger e g for a 60ft long heater the closest to the burner a bend can be is 30ft Figure 9 Possible Heater Orientations S20 S30 S40 S50 S60 S70 U20...

Страница 23: ...ENSION POINT TUBE STRAP DETAIL TUBE REFLECTOR SUSPENSION BRACKET DETAIL DETAIL FIXED REFLECTOR BRACKET REFLECTOR TUBE STRAP RADIANT TUBE 2 x SCREWS TIGHTEN TO FIX REFLECTOR SUPPLIED NUT BOLT H G F STA...

Страница 24: ...SLIDING REFLECTOR BRACKET DETAIL FIXED REFLECTOR BRACKET REFLECTOR TUBE STRAP RADIANT TUBE 2 x SCREWS TIGHTEN TO FIX REFLECTOR 2 x SCREWS MIN 1 8 GAP TO ALLOW REFLECTOR TO SLIDE SUPPLIED NUT BOLT BUR...

Страница 25: ...CTOR BRACKET REFLECTOR TUBE STRAP RADIANT TUBE 2 x SCREWS TIGHTEN TO FIX REFLECTOR 2 x SCREWS MIN 1 8 GAP TO ALLOW REFLECTOR TO SLIDE SUPPLIED NUT BOLT H G S F STANDARD 4 COUPLER BURNER INSERT DETAIL...

Страница 26: ...POINT TUBE STRAP DETAIL TUBE REFLECTOR SUSPENSION BRACKET DETAIL DETAIL SLIDING REFLECTOR BRACKET DETAIL FIXED REFLECTOR BRACKET REFLECTOR TUBE STRAP RADIANT TUBE 2 x SCREWS TIGHTEN TO FIX REFLECTOR 2...

Страница 27: ...NSION POINT TUBE STRAP DETAIL TUBE REFLECTOR SUSPENSION BRACKET DETAIL DETAIL SLIDING REFLECTOR BRACKET DETAIL FIXED REFLECTOR BRACKET REFLECTOR TUBE STRAP RADIANT TUBE 2 x SCREWS TIGHTEN TO FIX REFLE...

Страница 28: ...BURNER END CAPS OPTIONAL 6 4 61 6 NOMINAL OVERALL ASSEMBLED LENGTH END CAPS OPTIONAL DISTANCE BETWEEN SUSPENSION POINTS NOT TO EXCEED 12 10 3 REFL S TYPICAL OF 6 G G G S COUPLER HIGH TEMP COUPLER MOD...

Страница 29: ...TIONAL 6 4 71 6 NOMINAL OVERALL ASSEMBLED LENGTH END CAPS OPTIONAL DISTANCE BETWEEN SUSPENSION POINTS NOT TO EXCEED 12 10 3 REFL S TYPICAL OF 7 G G G S 6 OVERLAP G F HT COUPLER 6 OVERLAP S 3 OVERLAP F...

Страница 30: ...81 6 NOMINAL OVERALL ASSEMBLED LENGTH END CAPS OPTIONAL DISTANCE BETWEEN SUSPENSION POINTS NO TO EXCEED 12 10 3 REFL S TYPICAL OF 8 G F 3 OVERLAP G G G S HT COUPLER 6 OVERLAP G F HT COUPLER 6 OVERLAP...

Страница 31: ...REFLECTOR TUBE STRAP RADIANT TUBE 2 x SCREWS TIGHTEN TO FIX REFLECTOR SUPPLIED NUT BOLT F STANDARD 4 COUPLER BURNER INSERT SEE DETAIL NAT GAS ONLY G H 3 3 G G F BURNER INSERT DETAIL PT NO 201688 NOTE...

Страница 32: ...TAIL FIXED REFLECTOR BRACKET REFLECTOR TUBE STRAP RADIANT TUBE 2 x SCREWS TIGHTEN TO FIX REFLECTOR 2 x SCREWS MIN 1 8 GAP TO ALLOW REFLECTOR TO SLIDE SUPPLIED NUT BOLT S F G BURNER INSERT SEE DETAIL N...

Страница 33: ...SLIDING REFLECTOR BRACKET DETAIL FIXED REFLECTOR BRACKET REFLECTOR TUBE STRAP RADIANT TUBE 2 x SCREWS TIGHTEN TO FIX REFLECTOR 2 x SCREWS MIN 1 8 GAP TO ALLOW REFLECTOR TO SLIDE SUPPLIED NUT BOLT S F...

Страница 34: ...ACKET REFLECTOR TUBE STRAP RADIANT TUBE 2 x SCREWS TIGHTEN TO FIX REFLECTOR 2 x SCREWS MIN 1 8 GAP TO ALLOW REFLECTOR TO SLIDE SUPPLIED NUT BOLT S F G G H 3 3 G G G F S 6 REFLECTOR OVERLAPS S HT COUPL...

Страница 35: ...at are such that the heating system will be required to operate The fan will start to run and the power on lamp will illuminate Safe start checks are carried out automatically After the fan has run up...

Страница 36: ...off the gas supply at the shut off valve The heater should attempt to relight If the gas valve has been left off lock out should occur This is indicated by the power on lamp being illuminated and fan...

Страница 37: ...set to maximum and is calling for heat Switch on electrical supply The red neon should now be illuminated If restarting heater a delay of 15sec should be allowed A successful ignition is indicated by...

Страница 38: ...chanical contractor Soft Brush Phillips Screwdriver Leather Faced Gloves Wrench 4 1 Tools Required The following tools and equipment are advisable to complete the tasks laid out in this manual Suitabl...

Страница 39: ...r support casting to enable the burner to be removed from the radiant tube Step 6 Remove the burner and position in a safe area to prevent the burner or its attached components from falling to the gro...

Страница 40: ...and remove any dust with a soft brush Step 6 Remove any dust from fan scroll and from around the motor Step 7 Ensure the impeller rotates freely Step 8 Refit components 4 6 Burner Head and Electrode S...

Страница 41: ...are not liable to obstruction 4 10 Re commissioning After Service After servicing of the heater has been undertaken it is necessary to re commission the heater as detailed in the commissioning chart i...

Страница 42: ...571 201854 201905 201957 202132 Jet Carrier 40 150 NG 40 170 LPG 170 200 NG Item Required Spares In order to aid troubleshooting and servicing we recommend that the components shown in this section sh...

Страница 43: ...terminal F2 is 120VAC 2 Integrity of wiring connections 3 Fan Do the amber lights illuminate after a purge period NO Is there power to the fan YES NO CHECK 1 Relays 2 3 2 Voltage across terminals A1 A...

Страница 44: ...eady On Power Applied Control OK 1 Flash Combustion Pressure Switch Open With Blower On 2 Flashes Combustion Pressure Switch Closed With Blower Off 3 Flashes Lockout From The Three Ignition Trials 4 F...

Страница 45: ...harness connector Step 7 Test product and close access door 7 2 Air Pressure Switch Replacement Step 1 Disconnect the two silicone tubes from the pressure switch Step 2 Remove the two electrical chas...

Страница 46: ...curing screws arrowed from the base of the injector tube noting earth terminal connection Step 4 Remove the gas valve wiring connections noting their positions Step 5 Remove the four screws arrowed se...

Страница 47: ...inless Steel End Cap Kit 1Pair 90 Elbow Kit 1 Off 180 U Bend Kit 40 202579 202568 270615 202588 202638 60 202580 202569 80 202580 202570 100 202582 202571 125 202583 202572 150 202584 202573 170 20258...

Страница 48: ...Propane Altitude Conversion Kit Wind Rain Hood Kit Outdoor Only Stainless Steel End Cap Kit 1Pair 90 Elbow Kit 1 Off 180 U Bend Kit 40 202579 202568 202564 202588 202638 60 202580 202569 80 202582 20...

Страница 49: ...49...

Страница 50: ...50...

Страница 51: ...51...

Страница 52: ...l unit will lock out the power on lamp will remain illuminated and the fan will continue to run To reset after lockout switch off the power supply to the heater and wait 5 minutes then turn the power...

Отзывы: