![Amazone Tyrok 400 Скачать руководство пользователя страница 77](http://html1.mh-extra.com/html/amazone/tyrok-400/tyrok-400_original-operating-manual_2919779077.webp)
7.3 Moving the plough bodies into working position
1.
Open stop tap of the turning cylinders.
CMS-I-00004907
2.
Move the switch tap of the running gear into
position.
3.
Lift the implement via the tractor lower link.
4.
To lift the implement using the running gear,
actuate and hold "blue" tractor control unit.
Pressure of the traction assistance will be
dissipated.
5.
Observe the pressure display.
6.
Actuate the "blue" tractor control unit.
7.
To turn the plough bodies into working position,
Actuate the "green" tractor control unit.
8.
Bring the tractor control unit "blue" into float
position.
9.
Plough the first furrow.
10.
To align the frame horizontally to the ground,
Lower the implement using the tractor's lower
links.
0
CMS-I-00004905
CMS-T-00006474-B.1
7 | Using the implement
Moving the plough bodies into working position
MG7196-EN-GB | G.1 | 26.07.2022 | © AMAZONE
71
Содержание Tyrok 400
Страница 1: ...Original operating manual Trailed reversible plough Tyrok 400 Tyrok 400 V SmartLearning www amazone de...
Страница 6: ......
Страница 107: ......