![Amazone KE 3002 Скачать руководство пользователя страница 74](http://html1.mh-extra.com/html/amazone/ke-3002/ke-3002_original-operating-manual_2919765074.webp)
6.5.11 Preparing the liftpack system for operation
6.5.11.1 Adjusting the lower link catch hook
1.
Loosen the nuts
1
and remove them.
2.
Remove the bolts
3
.
NOTE
The closer the seed drill is attached behind the
roller, the lower the lifting force requirement.
3.
Move the lower link catch hooks
2
into the
desired position.
4.
Install the bolts.
5.
Install the nuts and tighten them.
6.
After 5 hours of operation, check the bolt
connection for tight fit.
2
3
1
330 Nm
CMS-I-00003375
6.5.11.2 Coupling the seed drill
1.
Remove the linch pin
1
.
2.
Remove the pin
2
.
3.
Open the locking straps
3
.
2
3
1
CMS-I-00003377
CMS-T-00004800-A.1
CMS-T-00004775-A.1
CMS-T-00004779-A.1
6 | Preparing the machine
Preparing the implement for operation
MG6878-EN-II | D.1 | 18.05.2021
68
Содержание KE 3002
Страница 1: ...Original operating manual Rotary harrow KE 3002 KE 4002 SmartLearning www amazone de ...
Страница 6: ......
Страница 119: ......