Taking delivery of the machine
Groundkeeper GHL; GHL-T SMARTCUT BAF0006.2 05.17
33
4
Taking delivery of the machine
On receiving the machine, please determine whether transport dam-
age has occurred or whether parts are missing. Compensation will
only be possible if claims are reported immediately to the carrier.
Please check that all the parts listed on the despatch note have been
delivered.
Before commissioning the machine, completely remove all packaging
including wires and check lubrication.
5
Attaching and detaching the machine to/from the tractor
5.1
Machine type GHL
Before the machine is attached to the tractor, care should be
taken to check that the three point linkage on the machine cor-
responds to the tractor's attachment category (CAT I or II).
•
Release the fastener on the lower link sockets (Fig. 5-1),
•
Move the lower link sockets to the required position and fasten in
place with 4 screws each.
•
Adjust the lower 3-point linkage to the tractor, so that the
tractor tire is no tin contact with the machine front castor
wheels.