Mechanical adjustments
GreenDrill BAH0054-4 02.13
29
4.4
Preparing the machine
for a calibration test or for emptying the hopper
Before climbing onto the loading board
Switch off the on-board computer
Switch off the tractor's universal joint shaft, apply the parking brake, shut down the tractor engine
and remove the ignition key
Wait until the tines of the rotary harrow (rotary cultivator) have come to a standstill.
1. Remove the calibration tray (1).
2. Fasten the chute (1) with two hand
knobs (2).
3. Place a suitable container under the chute
to collect the seed.
4. Carry out the calibration test as described in the chapters
On-board computer 3.2 (Calibration test)
On-board computer 5.2 (Calibration test).
5. Empty the hopper as described in the chapters
On-board computer 3.2 (Emptying the hopper)
On-board computer 5.2 (Emptying the hopper).
6. The chute and the calibration tray are reassembled in the reverse order.
Содержание GreenDrill 200-E
Страница 2: ...2 GreenDrill BAH0054 4 02 13...
Страница 69: ......