Amana PGB**C Скачать руководство пользователя страница 6

6

8. The unit must be connected to the building piping

by one of the following methods:

• Rigid metallic pipe and fittings

• Semirigid metallic tubing and metallic fittings (Alu-

minum alloy tubing must not be used in exterior
locations)

• Listed gas appliance connectors used in accor-

dance with the terms of their listing that are com-
pletely in the same room as the equipment

• In the prior two methods above the connector or

tubing must be protected from physical and ther-
mal damage. Aluminum alloy tubing and connec-
tors must be coated to protect against external
corrosion when in contact with masonry, plaster
or insulation or are subject to repeated wettings
by liquids (water - not rain water, detergents or
sewage)

Manual

Shut-Off

Valve

Gas 
Valve

Drip Leg

Ground Joint Union
(Installed Ahead Of Gas Valve)

Reduce coupling 1/2" x 1/8",
with 1/8" pipe plug to measure
line gas pressure.

Figure 2

Proper Piping Practice

Note:  To route the gas line from the gas valve to the
gas access hole in the side of the unit, a field supplied
3-3/4 inch long pipe and elbow is required.

Checking The Gas Piping

CAUTION

To prevent personal injury or property
damage due to fire, the following instruc-
tions must be performed regarding gas
connections and pressure testing:

• The unit and its gas connections must

be leak tested before placing in opera-
tion. Because of the danger of explo-
sion or fire, never use a match or open
flame to test for leaks. Never exceed
specified pressures for testing. Higher
pressure may damage gas valve and
cause overfiring which may result in
heat failure.

• This unit and its shut-off valve must be

disconnected from the gas supply dur-
ing any pressure testing of that system
at test pressures in excess of 1/2 PSIG
(3.48 kPa).

• This unit must be isolated from the gas

supply system by closing its manual
shut-off valve during any pressure test-
ing of the gas supply piping system at
test pressures equal to or less than 1/2
PSIG (3.48kPa).

WARNING

To avoid personal injury or property dam-
age, be sure there is no open flame in the
vicinity during air bleeding procedure.

There will be air in the gas supply line after testing for
leaks on a new installation. Therefore, the air must be
bled from the line by cracking open the ground joint
union until pure gas is expelled. Tighten union and wait
for five minutes until all gas has been dissipated in the
air. Be certain there is no open flame in the vicinity
during air bleeding procedure. The unit is placed in
operation by closing the main electrical disconnect switch
for the unit.

Tanks And Piping for Propane Gas
Installations

WARNING

To prevent death, personal injury or prop-
erty damage due to fire or explosion
caused by a propane gas leak,  install a
gas detecting warning device. Since rust
can reduce the level of odorant in pro-
pane gas, a gas detecting warning de-
vice is the only reliable way to detect a
propane gas leak. Contact a local pro-
pane gas supplier about installing a gas
detecting warning device.

IMPORTANT NOTE: Propane gas conversion
kits must be installed to convert units to pro-
pane gas. See Specification Sheet for kit part
number for this model.

All propane gas equipment must conform to the safety
standards of the National Board of Fire Underwriters
(See NBFU Manual 58).

Содержание PGB**C

Страница 1: ...afety practices follow them The precautions listed in this Installation Manual should not supersede existing practices but should be considered as supplemental information ATTENTION INSTALLING PERSONN...

Страница 2: ...shut off turn off the manual gas control valve to the unit before shut ting off the electrical supply WARNING To prevent death personal injury or prop erty damage do not use this unit if any part of t...

Страница 3: ...rn air entering the unit must be between 50 F and 100 F Provisions must be made for adequate combustion and ventilation air in accordance with Section 5 3 Air for Combustion and Ventilation of the Nat...

Страница 4: ...ht bill or indemnity in lieu thereof c Original invoice or certified copy thereof showing trade and other discounts or reductions d Copy of the inspection report issued by carrier representative at th...

Страница 5: ...propane gas and for altitude adjust ments Piping IMPORTANT NOTE To avoid possible unsatisfactory operation or equipment damage due to under firing of equipment do not undersize the natural propane ga...

Страница 6: ...ring which may result in heat failure This unit and its shut off valve must be disconnected from the gas supply dur ing any pressure testing of that system at test pressures in excess of 1 2 PSIG 3 48...

Страница 7: ...er gas pressure depends on three main factors 1 Vaporization rate which depends on a tempera ture of the liquid and b wetted surface area of the container or containers 2 Proper pressure regulation 3...

Страница 8: ...re 5 V Electrical Wiring Locating The Thermostat Thermostat should be mounted 5 feet above the floor on a vibration free inside wall in a room or a hallway that has good air circulation Movement of ai...

Страница 9: ...sformer primary lead and induced draft blower mo tor leads as shown on the unit wiring diagram Heat Anticipator Setting The heat anticipator in the room thermostat must be correctly adjusted to obtain...

Страница 10: ...duct should be provided with an access panel This access should be large enough to inspect the air chamber downstream from the heat exchanger for any smoke or combustion gas leaks A cover should be ti...

Страница 11: ...ocated and other spaces of the building Turn on clothes dryers and any appliance not connected to the common venting system Turn on any exhaust fans such as range hoods and bathroom exhausts so they w...

Страница 12: ...ll Out Protector Figure 9 Rollout Protection IX Heating Sequence of Operations Normal Sequence of Operation Heating 1 Thermostat calls for heat The combustion blower is immediately energized 2 The pre...

Страница 13: ...Figure 12 With Power And Gas On 2 Put unit into heating cycle and turn on all other gas consuming appliances Figure 12 Measuring Inlet Gas Pressure Alternate Method Secondary Limit Control On the PGB...

Страница 14: ...per cubic foot as deter mined by Step 2 then Input 1000 x 3600 0 34 106 000 BTU per Hour NOTE BTU content of the gas should be obtained from the gas supplier This measured input must not be greater t...

Страница 15: ...ishing phases of construction on a new struc ture This type of use may result in pre mature failure of the unit due to extremely low return air temperatures and expo sure to very dirty atmospheres To...

Страница 16: ...d with water thoroughly dried and sprayed with a filter adhesive before being reinstalled Filter adhesives may be found at many hardware stores Permanent filters should last several years However shou...

Страница 17: ...sonal injury due to electrical shock do not remove any in ternal compartment covers or attempt any adjustment Contact a qualified ser vicer at once if an abnormal flame ap pearance should develop At l...

Страница 18: ...ng Flame Roll Out Switch Blower Motor Gas Orifice Blower Wheel Heat Exchanger Burner High Limit Switch Compressor Secondary Limit Condenser Coil Ignitor Flame Sensor Condenser Fan Blade Induced Draft...

Отзывы: