The heating and cooling capacities of the unit should be
greater than or equal to the design heating and cooling
loads of the area to be conditioned. The loads should
be calculated by an approved method or in accordance
with  A.S.H.R.A.E. Guide or  Manual J - Load Calcula-
tions published by the Air Conditioning Contractors of
America.

Obtain from:

American National Standards Institute
1430 Broadway
New York, NY 10018

Transportation Damage

All units are securely packed in shipping containers
approved by the International Safe Transit Association.
The carton should be checked upon arrival for external
damage. If damage is found, a request for inspection by
carrier agent should be made in writing immediately.

The unit should be carefully inspected upon arrival for
damage and bolts or screws which may have loosened
in transit. In the event of damage, the consignee should:

1. Make notation on delivery receipt of any visible

damage to shipment or container.

2. Notify carrier promptly and request an inspection.

3. In case of concealed damage, carrier should be

notified as soon as possible-preferably within 5 days.

4. File the claim with the following supporting docu-

ments within the 9 month statute of limitations.

a. Original Bill of Lading, certified copy, or indemnity

bond.

b. Original paid freight bill or indemnity in lieu thereof.

c. Original invoice or certified copy thereof, showing

trade and other discounts or reductions.

d. Copy of the inspection report issued by carrier

representative at the time damage is reported to
the carrier. The carrier is responsible for making
prompt inspection of damage and for a thorough
investigation of each claim. The distributor or
manufacturer will not accept claims from dealers
for transportation damage.

NOTE: When inspecting the unit for transportation dam-
age, remove all packaging materials. Recycle or dis-
pose the packaging material according to local codes.

 III. Rigging and Handling

CAUTION

To prevent property damage, the unit
should remain in an upright position dur-
ing all rigging and moving operations.
To facilitate lifting and moving when a
crane is used, place the unit in an ad-
equate cable sling.

Important: If using bottom discharge with roof curb,
ductwork should be attached to the curb prior to install-
ing the unit. Ductwork dimensions are shown in Amana
roof curb installation instructions.

Refer to the Amana Roof Curb Installation Instructions
for proper curb installation. Curbing must be installed in
compliance with the National Roofing Contractors As-
sociation Manual.

Lower unit carefully onto roof mounting curb. While
rigging unit, center of gravity will cause condenser end
to be lower than supply air end.

If using a fork lift, see Figure 1 for location of fork
prongs. Make certain prongs support unit weight.

Figure 1

 Rigging

Содержание PGB**C

Страница 1: ...afety practices follow them The precautions listed in this Installation Manual should not supersede existing practices but should be considered as supplemental information ATTENTION INSTALLING PERSONN...

Страница 2: ...shut off turn off the manual gas control valve to the unit before shut ting off the electrical supply WARNING To prevent death personal injury or prop erty damage do not use this unit if any part of t...

Страница 3: ...rn air entering the unit must be between 50 F and 100 F Provisions must be made for adequate combustion and ventilation air in accordance with Section 5 3 Air for Combustion and Ventilation of the Nat...

Страница 4: ...ht bill or indemnity in lieu thereof c Original invoice or certified copy thereof showing trade and other discounts or reductions d Copy of the inspection report issued by carrier representative at th...

Страница 5: ...propane gas and for altitude adjust ments Piping IMPORTANT NOTE To avoid possible unsatisfactory operation or equipment damage due to under firing of equipment do not undersize the natural propane ga...

Страница 6: ...ring which may result in heat failure This unit and its shut off valve must be disconnected from the gas supply dur ing any pressure testing of that system at test pressures in excess of 1 2 PSIG 3 48...

Страница 7: ...er gas pressure depends on three main factors 1 Vaporization rate which depends on a tempera ture of the liquid and b wetted surface area of the container or containers 2 Proper pressure regulation 3...

Страница 8: ...re 5 V Electrical Wiring Locating The Thermostat Thermostat should be mounted 5 feet above the floor on a vibration free inside wall in a room or a hallway that has good air circulation Movement of ai...

Страница 9: ...sformer primary lead and induced draft blower mo tor leads as shown on the unit wiring diagram Heat Anticipator Setting The heat anticipator in the room thermostat must be correctly adjusted to obtain...

Страница 10: ...duct should be provided with an access panel This access should be large enough to inspect the air chamber downstream from the heat exchanger for any smoke or combustion gas leaks A cover should be ti...

Страница 11: ...ocated and other spaces of the building Turn on clothes dryers and any appliance not connected to the common venting system Turn on any exhaust fans such as range hoods and bathroom exhausts so they w...

Страница 12: ...ll Out Protector Figure 9 Rollout Protection IX Heating Sequence of Operations Normal Sequence of Operation Heating 1 Thermostat calls for heat The combustion blower is immediately energized 2 The pre...

Страница 13: ...Figure 12 With Power And Gas On 2 Put unit into heating cycle and turn on all other gas consuming appliances Figure 12 Measuring Inlet Gas Pressure Alternate Method Secondary Limit Control On the PGB...

Страница 14: ...per cubic foot as deter mined by Step 2 then Input 1000 x 3600 0 34 106 000 BTU per Hour NOTE BTU content of the gas should be obtained from the gas supplier This measured input must not be greater t...

Страница 15: ...ishing phases of construction on a new struc ture This type of use may result in pre mature failure of the unit due to extremely low return air temperatures and expo sure to very dirty atmospheres To...

Страница 16: ...d with water thoroughly dried and sprayed with a filter adhesive before being reinstalled Filter adhesives may be found at many hardware stores Permanent filters should last several years However shou...

Страница 17: ...sonal injury due to electrical shock do not remove any in ternal compartment covers or attempt any adjustment Contact a qualified ser vicer at once if an abnormal flame ap pearance should develop At l...

Страница 18: ...ng Flame Roll Out Switch Blower Motor Gas Orifice Blower Wheel Heat Exchanger Burner High Limit Switch Compressor Secondary Limit Condenser Coil Ignitor Flame Sensor Condenser Fan Blade Induced Draft...

Отзывы: