Amana AVH09 Скачать руководство пользователя страница 15

Indoor Return Air Grille and Ductwork 

Installation

AVLWP01A-R

 & AVLWP01A-L

 Return Air Grille with 

Access Panel

 

A field-supplied (25” x 20”) filter can be  

mounted inside the hinged access door.  The door can 

be installed with the grille oriented at the top of the panel 

for improved sound attenuation (Recommended for 

AVH09 & AVH12)

Option 1 

Field Supplied Return Air Grille

A field supplied return air grille divorced from the acces  

panel must have a minimum 250 square inches of free area.

Option 2

NOTE: All VTAC chassis are shipped with a filter 

installed

 (20" x 14" for AVH09, AVH12, & AVH18. 20" x 

18" for AVH24)

.  If a different filter holder or location is 

to be used, the filter on the chassis MUST be removed.

 

Ductwork

The supply duct system should be designed using a 

recognized method such as the equal fraction or velocity 

reduction method, using the appropriate duct calculator(s) 

for the type(s) of duct being used in the system.  The duct 

system should be designed for a maximum friction rate 

of .3” water column taking into consideration all fittings, 

registers and/or diffusers.

NOTE: Do not operate the unit without a supply duct 

attached. The return air to the VTAC unit MUST NOT 

be ducted and all units must have a free return air 

configuration to perform properly.

Chassis Installation

CAUTION

EXCESSIVE WEIGHT HAZARD

USE TWO OR MORE PEOPLE WHEN  

INSTALLING YOUR AIR CONDITIONER.

FAILURE TO DO SO CAN RESULT IN BACK OR 

OTHER INJURY.

CAUTION

CUT / SEVER HAZARD

SOME EDGES MAY BE SHARP, USE GLOVES 

OR OTHER HAND PROTECTION WHEN  

HANDLING UNIT.

FAILURE TO DO SO CAN RESULT IN MINOR TO 

MODERATE PERSONAL INJURY.

1. Ensure that the wall adapter and louver are installed

in accordance with the instructions listed on pages

5-7.

2. Place the chassis into the closet with the outdoor

side facing the wall adapter opening.

3. Slide the chassis into the wall adapter until the

adapter divider seal is established.

NOTE: The VTAC chassis must be inserted into the 

wall adapter so that the adapter divider gasket makes 

contact with the plastic condenser baffle on the unit.  

The chassis will fit approximately 2 3/8” into the wall 

adapter.

14

Содержание AVH09

Страница 1: ...e equipment specified in this manual only licensed personnel should servise the equipment Improper installation adjustment servicing or repair of the equipment specified in this manual or attempting t...

Страница 2: ...ntent of this manual the precautions listed here take precedence Important Note to the Servicer Read this manual and familiarize yourself with the specific items which must be adhered to before attemp...

Страница 3: ...Y Wire sizes are per NEC Recommended Branch Circuit Sizes Nameplate Maximum Circuit Breaker Size AWG Wiring Size 15A 14 20A 12 30A 10 AWG American Wire Gauge Single circuit from main box Based on 100...

Страница 4: ...the HIGH speed output to the GH terminal VTAC Required Minimum Clearances Building Exterior Unit Opening Requirements VTAC units must be installed on an outside wall Confined spaces and or covered are...

Страница 5: ...ation Overview and Dimensional Data Closet View NOTE It is recommened that 6 of clearance is provided on the side where the primary condensate is plumbed 3 4 Exterior Wall Adapter Cut Out Dimensions W...

Страница 6: ...1 8 26 1 8 CLOSET INSTALLATIONS 5 Access Door Cutout 27 Min 3 Required 23 1 8 23 1 8 30 5 8 Min Required Inside Closet Dimension 23 1 8 Access Door Cutout 27 23 1 8 23 1 8 30 5 8 Min Required Inside...

Страница 7: ...x 24 1 8 W x 30 3 8 H Large Chassis Unit Unit height 47 Filter 14 x 20 Small Chassis Unit Unit height 32 Filter 14 x 20 AVDK18 2401B drain pan required Sold Shipped Separately Architectural Grille AV...

Страница 8: ...ry any structural load A load bearing header must be built above the rough opening 1 Prepare the rough opening The rough opening should be lined with metal or wood The Wall Adapter will warp if sealed...

Страница 9: ...pilot holes on the interior of the inside Wall Adapter half Part B as show in Detail B Pilot holes should be located approximately 4 from the top and bottom of the inside Wall Adapter half on both th...

Страница 10: ...safety tether Final Wall Adapter and Architectural Louver Installation NOTE Ensure that the weather strip is undamaged and provides a continuous seal around the inner perimeter of the Wall Adapter App...

Страница 11: ...tem drain waste vent may result in staining of the outside wall 2 Insert the provided 3 4 nipple into the determined connection using field supplied Teflon tape or pip joint compound 3 With the slip e...

Страница 12: ...of the removed gasket The secondary overflow lip must extend into the plenum to prevent water leaks The pan should be mounted against the 3 4 flange of the plenum refer to view A Figure 2 Install Dra...

Страница 13: ...ndensate line as shown in Option 4 below as the drain line will come into contact with the factory installed isolators beneath the unit Figure 5 Option 1 Run condensate line to left of unit Option 3 R...

Страница 14: ...ERSONAL INJURY OR DEATH DUE TO ELECTRICAL SHOCK DO NOT USE AN EXTENSION CORD WITH THIS UNIT CAUTION TO AVOID RISK OF PROPERTY DAMAGE PERSONAL INJURY OR FIRE USE ONLY COPPER CONDUCTORS CAUTION TO AVOID...

Страница 15: ...for a maximum friction rate of 3 water column taking into consideration all fittings registers and or diffusers NOTE Do not operate the unit without a supply duct attached The return air to the VTAC...

Страница 16: ...ation will stop NOTE The desk control system and switches must be field supplied Maximum Wire Length for Desk Control Switch AWG Wire Size Maximum Length ft 24 400 22 600 20 900 18 1500 16 2000 Auxili...

Страница 17: ...with outdoor ambient conditions greater than 110 F Chassis Operation Fresh Air Door The fresh air door is an intake system It is opened via a slide mechanism on the front of the chassis located just a...

Страница 18: ...hrough the filter and collect on the indoor ai These minor accumulations can be carefully vacuumed away with a brush attachment on a vacuum claner Care must be taken to avoid bending the aluminum finn...

Страница 19: ...ration after lockout time 8 Unit Cycles greater than 9 Times per hour The unit will continue to operate and be monitored 9 Unit Cycles less than 3 Times per Hour The unit will continue to operate and...

Страница 20: ...anization To obtain an authorized servicer contact your sales representative is a registered trademark of Maytag Corporation or its related companies and is used under license to Goodman Company L P H...

Отзывы: