The supply duct from the unit through a wall may be 

installed without clearance. However, minimum unit 

clearances as shown in the appendix must be maintained.  

The supply duct should be provided with an access panel 

large enough to inspect the air chamber downstream of 

the heat exchanger. A cover should be tightly attached to 

prevent air leaks.

For duct flange dimensions on the unit refer to the Unit 

Dimension illustration in the appendix.

For down-discharge applications, the ductwork should 

be attached to the roof curb prior to installing the unit. 

Ductwork dimensions are shown in the roof curb installation 

manual.

If desired, supply and return duct connections to the unit 

may be made with flexible connections to reduce possible 

unit operating sound transmission.

Filters

CAUTION

To prevent property damage due to fire and loss of 

equipment efficiency or equipment damage due to dust and 

lint build-up on internal parts, never operate the unit 

without an air filter installed in the return air system.

Even though a return air filter is not supplied with this unit, 

there must be a means of filtering all return air. All units 

may be externally filtered.

Refer to the unit filter size chart in the appendix for filter 

size information.

Filters installed external to the unit should be sized in 

accordance with their manufacturer recommendations. A 

throwaway filter must be sized for a maximum face velocity 

of 300 feet per minute. 

Filter Installation

IMPORTANT NOTE: When installing a filter, the air 

flow arrows on the filter must point toward the 

circulator blower.

VENTING

NOTE: Venting is self-contained. Do not modify or 

block.

Installation - Flue Hood Exhaust

1. 

Locate the flue hood assembly box in the unit.

2. 

Slide screen over flanges on the lower flue hood.

3. 

Slide screen and lower flue hood into hood.

4.  Using the three screws provided, attach the hood 

(with the opening facing down) over the flue exhaust 

opening in the utility panel.

SCREEN

HOOD

LOWER

FLUE

HOOD

LIP

Installation - Combustion Air Intake Hood

1.  Locate the second hood.

2.  Using the three screws provided, attach the hood 

(with the opening facing down) to the heat exchanger 

access door.

CONDENSATE DRAIN

Condensate Drain Connection

A 3/4” NPT drain connection is supplied for condensate 

piping. An external trap must be installed for proper 

condensate drainage.

DRAIN

CONNECTION

UNIT

2" MINIMUM

FLEXIBLE

TUBING-HOSE

OR PIPE

3" MINIMUM

A POSITIVE LIQUID

SEAL IS REQUIRED

Drain Connection

Содержание A/GPU14 M Series

Страница 1: ...Please contact your distributor or our website for the applicable Specification Sheets referred to in this manual This Forced Air Central Unit Design Complies With Requirements Embodied In The America...

Страница 2: ...djustments 16 EEM Motors 16 Limit Check 17 Unit Shut Down 17 Compression Protection Devices 17 Refrigerant Charge Check 17 Cooling Refrigerant Charging Models with TXV 17 Superheat Adjustment 17 Cooli...

Страница 3: ...seated and attached with the PCB or else the unit might not function as intended ID Plug PCB Terminal J9 Adjusting Gas Manifold Pressure Use the below manifold pressure settings Gas Input BTU HR Manif...

Страница 4: ...uilding Immediately call your gas supplier from a neighbor s phone Follow the gas supplier s instructions If you cannot reach your gas supplier call the fire department Installation and service must b...

Страница 5: ...n est n cessaire pour viter le danger d intoxica on au CO pouvant survenir si un appareil produisant du monoxyde de carbone con nue de fonc onner au sein de la zone confin e Esta ven laci n es necesar...

Страница 6: ...n monoxide poisoning or death The following steps shall be followed with each appliance connected to the venting system placed in operation while any other appliances connected to the venting system a...

Страница 7: ...observed when installing the unit IMPORTANT NOTE Remove wood shipping rails prior to installation of the unit All Installations For proper flame pattern within the heat exchanger and proper condensate...

Страница 8: ...constructed using industry guidelines The duct work must be placed into the roof curb before mounting the package unit Curb insulation cant strips flashing and general roofing material are furnished b...

Страница 9: ...400 610 70 46 96 180 370 560 80 43 90 170 350 530 90 40 84 160 320 490 100 38 79 150 305 460 Pressure 50 PSIG or less and Pressure Drop of 0 3 W C Based on 0 60 Specific Gravity Gas Natural Gas Capac...

Страница 10: ...ermostat Location Mount the thermostat approximately five feet above the floor in an area that has an inside vibration free wall and has good air circulation Movement of air must not be obstructed by...

Страница 11: ...30 35 40 45 50 SUPPLY WIRE LENGTH FEET 200 6 4 4 4 3 3 2 2 150 8 6 6 4 4 4 3 3 100 10 8 8 6 6 6 4 4 50 14 12 10 10 8 8 6 6 Wiring Table CIRCULATING AIR AND FILTERS Airflow Conversion Units can easily...

Страница 12: ...All units may be externally filtered Refer to the unit filter size chart in the appendix for filter size information Filters installed external to the unit should be sized in accordance with their man...

Страница 13: ...tisfied 5 The compressor and outdoor fan will be de energized when the thermostat opens 6 The indoor blower continues to run at low cool speed for approximately 60 seconds after the thermostat is sati...

Страница 14: ...be as specified on the unit rating plate with all other household gas fired appliances operating The line pressure supplied to the gas valve must be within the Inlet Gas Supply Pressure range specifie...

Страница 15: ...ressure tap 5 Turn ON the gas supply 6 Turn ON power and close thermostat R and W contacts to provide a call for heat 7 Using a leak detection solution or soap suds check for leaks at outlet pressure...

Страница 16: ...give the correct air temperature rise through the unit as marked on the rating plate External Static Pressure Check The total external static pressure must be checked on this unit to determine if the...

Страница 17: ...ect electrical power before inspecting or servicing the unit NOTE All compressor protection devices reset automatically energizing the contactor and outdoor fan WARNING Do not bypass safety devices Re...

Страница 18: ...Record the gauge pressure and the temperature of the line 4 Compare the hi pressure reading to the Required Liquid Line Temperature chart Find the hi pressure value on the left column Follow that line...

Страница 19: ...is outside the acceptable range for the null value the control enters a five minute lockout After the lockout timer has expired the control resumes normal operation During inducer operation including...

Страница 20: ...nlet and flue outlet hoods are not blocked by debris which would prevent adequate combustion air and a properly operating vent system Filter Replacement or Cleaning A return air filter is not supplied...

Страница 21: ...ormation on the yearly inspection consult the User Manual It is recommended that a qualified servicer inspect and service the unit at least once each year Turn the unit on at the thermostat Wait a few...

Страница 22: ...LASH RETRIES EXCEEDED RED 1 HOUR FIXED 10 FLASHES HIGH LIMIT SWITCH RECOVERY TIMER EXPIRED RED 1 HOUR OR HARD LOCKOUT RAPID FLASH CLEAR ERROR HISTORY GREEN N A 2 FLASHES PRESSURE SENSOR NULL ERROR RED...

Страница 23: ...U1442 M41 47 51 40 42 1 2 Large A GPU1448 M41 47 51 40 42 1 2 Large A GPU1461 M41 47 51 40 42 1 2 Large Model Unit Dimensions Inches Height Chassis Size W H W H A GPU1424 M41 16 16 16 16 A GPU1430 M41...

Страница 24: ...PRIMARY LIMIT SWITCH RC RUN CAPACITOR TON ON DELAY TIMER RELAY TR TRANSFORMER VM VENT MOTOR WIRE CODE BLACK BLUE BROWN GREEN GRAY ORANGE PINK PURPLE RED TAN WHITE YELLOW BK BL BR GR GY OR PK PU RD TN...

Страница 25: ...2 R2 PU 3 5 4 3 2 1 YL GR LINE VOLTAGE 208 230V 1PH 60Hz R C RD L1 L2 G R W Y C 5 4 3 2 1 GR COM TR BR RD BK RD YL OR BR WH BK OR YL BR 1 2 BK WH VM GR GR GR BL BL HPS LPS PU R C G Y2 Y1 W1 1 TO THERM...

Страница 26: ...instructions D gaugement conforme aux codes d installation locaux aux exigences du fournisseur de gaz et aux instructions d installation du fabricant NOTE Roof overhang should be no more than 36 RECO...

Страница 27: ...38 41 502 159 X 773 237 1011 324 0 8 444 165 828 245 42 444 165 X 690 245 948 329 PU1430060M41 Rise Range 30 60 E S P T1 FAN ONLY SPEED T2 HEATING SPEED T3 HEATING SPEED T4 COOLING SPEED T5 COOLING SP...

Страница 28: ...677 0 7 644 196 966 305 52 899 278 56 1451 550 1629 686 0 8 587 206 901 315 54 832 285 59 1397 556 1578 693 PU1448080M41 Rise Range 30 60 E S P T1 FAN ONLY SPEED T2 HEATING SPEED T3 HEATING SPEED T4 C...

Страница 29: ...ssor motor is hermetically sealed and does not require additional oiling Annual Inspection Qualified Servicer Only Your package unit should be inspected by a qualified installer or service agency at l...

Страница 30: ...iquid Propane Residential Package Outdoor Section ELECTRICAL Supply Voltage Measure L1 and L2 Voltage L1 L2 Compressor Amps Condenser Fan Amps PRESSURES TEMPERATURES Suction Circuit Pressure Suction L...

Страница 31: ...31 PAGE LEFT INTENTIONALLY BLANK...

Страница 32: ...out us contact us You can also scan the QR code on the right for the product brand you purchased to be directed to the feedback page Our continuing commitment to quality products may mean a change in...

Отзывы: