Supervisor 3000 Installation Instructions
PUD3628R1-2
For assistance: [email protected] +1 (909) 591-8431
Page 35
Connect Primary Power to Enclosure(s)
G
N
L
Primary
Power
Primary Power
Terminal Block
The primary wiring lines for 110VAC and 220VAC consist of the
following:
Terminal
110V
220V
L
ine
Black
Brown
N
eutral
White
Blue
G
round
Green
Green/Yellow
3. Route primary power conduit to one of the supplied conduit
holes on the enclosure [Figure C3].
4. Locate the pre-installed primary power terminal block
[Figure C3]. There is one primary power terminal block per
enclosure.
5. Attach each primary power wire to the primary power
terminal block according to the table above [Figure C3A].
6. Using a Phillips-head screwdriver, tighten each terminal
block connection.
7. Attach the supplied protective cover on the terminial block.
8. Repeat Steps 3 for 7 for additional power supply
enclosures.
Fig. C3
Primary Power Terminal Block
Fig. C3A
Primary power wiring and connectors are not supplied by
Alvarado.
NOTE
Conduit
Hole
Conduit
Hole
Содержание SU3000
Страница 41: ...This page intentionally left blank...