![Altronix eFlow102NA8D Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/altronix/eflow102na8d/eflow102na8d_quick-start-manual_2913319009.webp)
eFlowNA8D Series Installation Guide
- 9 -
Tamper Switch
NC C NO NC C NO
AC FAIL
BAT FAIL
TRIGGER
AC DC
AC1
EOL
NO
GND
SUPERVISED
RESET
+AUX-
- BAT
+-
DC
+
L G N
OFF - 24V
ON - 12V
ON
eFlow4NB - power-limited
eFlow6NB, eFlow102NB,
eFlow104NB - non power-limited
Fire Alarm Interface
(power-limited)
DC Output to devices (
power-limited
)
Battery and AC
Supervision Circuit
(power-limited)
power-limited
Input (power-limited)
Observe polarity
Battery Connections (non power-limited)
OUTPUT 1 OUTPUT 2 OUTPUT 3 OUTPUT 4 OUTPUT 5 OUTPUT 6 OUTPUT 7 OUTPUT 8
NC C NO COM NC C NO COM NC C NO COM NC C NO COM NC C NO COM NC C NO COM NC C NO COM NC C NO COM
IN GND IN GND IN GND IN GND
IN GND IN GND IN GND IN GND
1 2 3 4
5 6 7 8
INPUT
TRIGGER
10A 250V
+INP- T + RET-
NO C NC
FACP INTERFACE
Power Control
- + -
+
F1 F2 F3 F4 F5 F6 F7 F8
MAIN
TRG
FACP
1 2 3 4
1 2 3 4
O N
O N
1 2 3 4
1 2 3 4
O N
O N
Green Flying Lead
Unswitched 120VAC
power mains
(non power-limited)
Optional Rechargeable Stand-by Battery
for UL294 Applications
Note: 12V batteries required for
ULC-S319 installations.
Optional Rechargeable Stand-by Battery
for UL294 Applications
Note: 12V batteries required for
ULC-S319 installations.
CAUTION: When power supply board is set for 12VDC use only one (1) 12VDC stand-by battery.
Keep power-limited wiring separate from non power-limited. Use minimum 0.25" spacing.
12AH Rechargeable batteries are the largest batteries that can fit in this enclosure.
A UL listed external battery enclosure must be used if using 40AH or 65AH batteries.
Fig. 3 -
eFlowNA8D Series Configuration
Fig. 3a
Tamper Switch
(included)
To Access Control Panel or
UL Listed Reporting Device
Edge of
Enclosure
Enclosure
Содержание eFlow102NA8D
Страница 13: ...eFlowNA8D Series Installation Guide 13 Notes...
Страница 14: ...14 eFlowNA8D Series Installation Guide Notes...