21
Board Installation
7
Diagram 40
Diagram 41
If you have purchased the low level louvre you can either fit it
now or simply leave out the board where you want the louvre
to be positioned and fit it later.
To fit the boards slot the top edge into the mid rail (the top of
the board has the baton closest to the edge), then push the
bottom of the board in until it touches the frame. The board
will drop slightly and the bottom baton will rest on the cill.
Work your way around the building until all the boards are in
place. Once in position you can fix them with the cedar panel
capping (EV0979), diagram 42. This capping is used all around
the building apart from either side of the door and in the
middle of the rear panels, special capping is used here (diagram
43). Fix the capping in place with 40mm Pan head screws
(diagram 41).
Low Level Louvre? Page 62
EV0979
40mm
Screw
Diagram 42
EV0979
Section
EV0985
Section
Diagram 43
Dia. 41
Dia. 43
Содержание Evolution Octagonal 9x6
Страница 1: ...1 04 19...