53
Staging Installation
18
You now need to bolt the internal arm (EV1120M) onto the underside of the slats (diagram 138). This
uses the extra bolts you inserted earlier. Loosely fit the nuts for now. Before attaching the internal
arm to the longest slat you also need to attach the diagonal support (EV0350M) to the same bolt.
Line the ends of the internal arm up with the front edge of the staging (diagram 140) and with the
outer staging arm at the rear (diagram 141), once happy with the position tighten all the nuts.
The extra bolt in the longest slat should be left towards the rear of the building as this is used to
connect the next section of staging (shown by the arrow in diagram 138).
Internal
Diagram 138
Dia. 140
Dia. 139
Diagram 140
Diagram 139
EV
11
20
M
Internal
Internal
E
V
0
3
5
0
M
EV
03
50
M
Using a level make sure the staging is flat and
level before fixing the diagonal support in place
with a large head 25mm screw (diagram 139).
Repeat this installation for the other side of the
greenhouse.
Diagram 141
EV
11
20
M
EV1
121
M
Dia. 141
Содержание Evolution Octagonal 9x6
Страница 1: ...1 04 19...