7
Base Assembly
3
EV0296M
EV0
304
M
EV0294
M
4 x 8
example
D174M
EV0289M
EV0311M
D174M
EV02
96M
EV0304
M
Internal
Diagram 2
Dia. 3
Dia. 1
Lay out your aluminium base sections as the diagram shows.
Use the joining bracket in each corner to join the sections
(diagram 2). The top holes will take a 25mm screw when the
side cills are fixed to it. Also attach a joining bracket to the
plain gable base section closest to the wall (diagram 3). Next
fit the front door cill with 2 plates (HE512M), diagram 1. Part
EV0289M can be bolted to the door cill with one of the plates,
this might seem odd to start with but once the wall bar is
attached and fixed to the wall it will all firm up.
Look for the length of building you have in the table below to
check which parts you should be using.
Use the crop-head bolts along the bolt channels for attaching
the base brackets (D174M), diagram 2.
NB. For Extensions refer to a separate manual.
EV0287
M
EV0296M
EV0311M
Diagram 3
Internal
Base Parts
Part Name
Part
Number
Qty Qty Qty Qty Qty
Front Base:
4ft 6ft 8ft 10ft 12ft
4ft long
EV0302M
1
6ft long
EV0303M
1
8ft long
EV0304M
1
10ft long
EV0305M
1
12ft long
EV0306M
1
Plain Gable
EV0296M
1
1
1
1
1
Door Gable
EV0294M
2
2
2
2
2
Door Cill
EV0287M
1
1
1
1
1
Joining Bracket
EV0311M
3
3
3
3
3
Base Bracket
D174M
6
7
8
8
8
Cill Plate
HE512M
2
2
2
2
2
Wall Bar Base
EV0289M
1
1
1
1
1
Dia. 2
EV0
287
M
HE512M
EV0
294
M
Internal
Diagram 1