20
Frame Assembly
7
Dia. 30
Diagram 30
Once all the roof bars are in place
slide the building away from the
wall enough to stick the foam
strip to the ridge and wall bars,
diagram 30. This comes in 7
meter rolls. If you have a slightly
uneven wall this will act as a draft
excluder.