Frame Assembly
Slide the building back to the wall, using a spirit level make sure the wall bars are vertical and the
ridge bar is horizontal. If you have to pack the base to get the ridge level you may find you will have
to do the same for the front of the building to get the eaves level. It is important that the ridge and
eaves are parallel as any twist in the building will make glazing difficult.
When you are happy with the position of the frame, drill through the wall bars and ridge and fix with
50mm screws and rawl plugs. Below is an example of how many fixings you might use and where to
place them, this is dependent on the donor wall so adjust the positions to suite.