Earth continuity checks should be carried out on the machine, and on its fixed wiring installation, when the
equipment is installed, and at regular intervals afterwards.

4.6

Guarantee

Our General Terms of Sale and Delivery do prevail.

This Guarantee only covers proved defects of material and of workmanship.

In order to obviate non-justified claims, we are enumerating below those keypoints, which shall not be covered
by this Guarantee:

Damages caused by changing the machine´s adjustment.

Damages of transportation.

Damages due to careless handling by the orderer, or due to violence.

Damages caused by non-observance of our Decalcifying Instructions.

Damages caused by non-observance of our Operating Instructions.

Damages on products other than ours are handled according to the Guarantee of the respective manufacturer.

Damages occuring on hoses shall be only subject to guarantee if the manufacturer has recognized the damage
after examination.

Damages occuring on packings, seals, ignition electrodes, high pressure nozzles and other items, which are due
to normal wear.

5

Maintenance

5.1

Maintenance Plan -  drive motor

Refer to Honda Operating Instructions

5.2

Maintenance Plan -  high pressure pump

Every 40 hours of operation - at least once a week

Pump oil level control  -  control oil level regularly at dipstick of oil filler plug - if ncessary, refill with gear lubricant
oil. Change oil whenever it shows a greyish or white shade.

Clean filter (at water feed)

Clean filter (at pump)

Every 200 hours of operation - at least once every 3 months

Pump oil change  - for inst. ARAL DEGOL BG 220, Shell Omala 220, Mobil Gear 630

V-belt tightening - if neccesary, regulate at generator

Igniter - ignition transformer, ignition cable, ignition electrodes (to e cleaned) , replace defective parts.

Oil nozzle - clean it.

Oil fiter  - clean it.

Solenoid valve - clean it, clean strainer.

In case of necessity - but at least every 12 monts

Содержание CS 1020 DE

Страница 1: ...0 PE CS 1020 DE Betriebsanleitung 4 Operating Instructions 18 Notice d utilisation 32 Gebruiksaanwijzing 46 Driftsinstruks 60 Bruksanvisning 74 Driftsvejledning 89 K ytt ohje 102 Instrucciones de mane...

Страница 2: ...36 EWG elektromagnetica EN 292 EN 60335 1 EN 60555 3 EN 50081 DIN EN 60335 1 E DIN VDE 0700 T 265 IEC 335 2 79 Bellenberg 23 09 1994 Atestado de conformidad de la UE EG Verklaring van overeenstemming...

Страница 3: ...Wap Reinigungssysteme GmbH Co Guido Oberdorfer Stra e 2 8 D 89287 Bellenberg Produkt Typ Beskrivning Apparatens konstruktion motsvarar f ljande till mpliga best mmelser Till mpade harmoniserade normer...

Страница 4: ...ght out to match these machines 2 dosing valve 51 instrument board 5 motor 52 water outlet 11 pressure gauge 53 spray lance rest clamp 12 tap water feed 54 intake hose for cleaning and care agents 50...

Страница 5: ...Machine Structure Petrol diesel operated machine nonsystem connected mobile and protable drive motor refer operating instructions Honda 2 2 Operating Symbols piston pump burner thermostat cleaning an...

Страница 6: ...d via a thermostat The fuel oil burner is fed with fuel oil via a fuel oil pump wich is flanged onto the oil burner motor Fuel is injected under pressure into the combustion chamber A high pressure bl...

Страница 7: ...50 m the next size larger nozzle is to be applied f ex instead of 2505 use 2506 Depending on the kind and extent of dirt involved and according to the cleaning job to be performed the appropriate high...

Страница 8: ...acitor F2 fine wire fuse 6 3A 5509 F3 pressure switch F4 low petrol cutoff flow control G1 generator K2 time relay retarded fuel supply M1 motor pump M2 motor burner P1 working hour meter Q1 master sw...

Страница 9: ...nozzle with strainer 1 additives tank 2 dosing valve 3 filter 4 infinite regulation of pressure and quantity 5 motor 6 generator 7 high pressure pump 8 regulation safety block 9 safety valve 10 hydra...

Страница 10: ...o be fixed in position ON When interrupting stopping work the trigger gun locking device of the spray lance is to be blocked The machine complies with the German Directives for Ejectors of Liquids hig...

Страница 11: ...xpertly Never direct the jet against persons During the machine s operation recoil forces do occur at the spraying device spray lance with bent spray lance there will be torgue additionally 4 3 Operat...

Страница 12: ...Honda Operating Instructions Actuate trigger gun on off until machine will be depressurized Lock the trigger Close water tap For operation during winter season Place machine into a frostproof room Sho...

Страница 13: ...s shall be only subject to guarantee if the manufacturer has recognized the damage after examination Damages occuring on packings seals ignition electrodes high pressure nozzles and other items which...

Страница 14: ...jet is to emerge from the water outlet tube Should this not be the case then decalcify once again Screw high pressure nozzle onto the spray lance and re connect the high pressure hose Caution The deca...

Страница 15: ...4 2 c float valve clogged clean valve and filter d suction and pressure valve of high pressure pumpe defective or dirty dismount valves clean and or replace these Clean suction hose filter de aerate t...

Страница 16: ...ents container re fill it b cleaning and care agents container silted up clean it c suction valve at cleaning and care agents feed dirty resp defectifve disassemble it clean rep replace it d air in th...

Страница 17: ...enever water is short the fuel supply to the oil burner This is done via a solenoid valve By this the heat exchanger is not overheated 7 2 Safety Valve It serves the tastk to prevent inadmissible exce...

Страница 18: ...NOTIZEN...

Страница 19: ...enter Ulm D 89287 Bellenberg Guido Oberdorfer Stra e 2 8 Tel 49 07306 72 195 Fax 49 07306 3 41 29 e mail rculm wap online de GREAT BRITAIN ALTO Cleaning Systems UK Ltd Gilwilly Industrial Estate GB Pe...

Отзывы: