17
AlterG Installation Manual
105440 rev C
4.
Fasten each stanchion to the base
frame using 4 of the 3/8 – 24
flathead screws provided. Install
the screws so they are s
nug
, but do
not tighten at this time.
5.
The rear of the stanchion should be
bolted to the frame with two 5/16 -
18 socket cap screws. They are
inserted through the cutout in the
base of the stanchion.
Do not
tighten at this time.
6.
Bolt the front side rails to the base
using two 3/8 x 16 socket cap
screws on both sides. You may
have to look through the outer
clearance hole of the rail to line up
the inner rail hole with the
threaded hole in the base.
Do not
tighten at this time.