
20
AlterG Installation Manual
105440 rev C
Installation of the Cable Guide
1.
Unpack the cable guide. A spring
steel piece shapes the guide as it
exits the cockpit carriage. Make sure
the spring steel is fully enclosed in
the guide.
2.
Verify that all links are connected
and all cross bars are snapped shut.
3.
Snap cable guide to the lower
bracket on the bottom of the power
box. Ensure that the cables are
routed straight out of the bracket.
4.
Move load cell cables to outside of
machine and all other cables to
inside of machine
5.
Connect the load cell cables exiting from the cable
guide to the corresponding cables coming from
the base. The load cell cables are labeled. Make
sure the connectors lock in place.
End link at
t
ache d
to powe r box