![Altendorf F45 ProDrive Скачать руководство пользователя страница 74](http://html1.mh-extra.com/html/altendorf/f45-prodrive/f45-prodrive_operating-manual_2910755074.webp)
Transport, siting and installation
74
Transport, siting and installation
0000010038-003- GB
i
Note!
Observe the following:
•
Make sure that the extraction system is switched on together with the
machine. For this, you can use the existing potential-free contact
(POT - refer to circuit diagram) or a current transformer installed in
the supply line.
•
When using spray device (SPRAY), make sure that you use a suita-
ble moisture extraction system in order to avoid faults.
•
Check the function of the extraction system at regular intervals!
•
A spark-extinguishing system should be installed as a precaution to
prevent fires and explosions in filter systems, silos and other produc-
tion environments.
•
Ensure that the extraction system is suitable for extracting aluminium
chips!
•
Always collect wood, aluminium and plastic chips separately!
•
Prior to cutting aluminium, thoroughly clean the machine and remove
all remaining dust and chips!
Содержание F45 ProDrive
Страница 8: ...Identification 8 Identification 0000010038 003 GB EC prototype testing certificate...
Страница 9: ...Identification 9 0000010038 003 GB Identification...
Страница 10: ...Identification 10 Identification 0000010038 003 GB GS test certificate...
Страница 11: ...Identification 11 0000010038 003 GB Identification...
Страница 12: ...Identification 12 Identification 0000010038 003 GB DGUV Test Certificate...
Страница 13: ...Identification 13 0000010038 003 GB Identification...
Страница 14: ...Identification 14 Identification 0000010038 003 GB C US Certificate...
Страница 39: ...Definitions 39 0000010038 003 GB Definitions...
Страница 155: ...Operating 155 0000010038 003 GB Operating i Note For information on how to handle batteries see chapter 3 6 4...
Страница 189: ...Cleaning care 189 0000010038 003 GB Cleaning care i Note No relubrication of the saw shaft is necessary...