6.
Site Preparation
1.
Prepare required tools, e.g. screwdriver.
2.
Prepare a CAT5 (or higher) network cable for network connection of A8 base
station. Please make sure that the network connection (Ethernet Cable)
between central office and the site is properly connected.
3.
Make sure that there is AC electrical power supply for A8 base station at the site.
4.
Configure the A8 base station properly, e.g. assign an applicable IP address for
A8 base station.
5.
Prepare 8 RF cables for RF connection (N-type connector) between antennas
and base station. Please refer to the Section 0
Figure 6-1 RF ports with water-proof rubber tape
Figure 6-2 Connecting to BTS
6.
Weatherproofing the RF Connectors Wrap the RF connectors with waterproofing
kits. Please refer Section 13 Recommendation on RF cable and Antenna Pole.
7.
Mounting A8 antenna on a pole
1.
Mount the antenna to the pole, as shown in Figure 7-1. Mount antenna on pole.