9.
Mounting A8 Base Station on the Pole
1.
Use the metal tapes to mount the metal plate onto the pole, Figure 9-1.
2.
Mount the A8 base station on the metal plate and make sure four nuts in position
to the slot of the plate, Figure 9-2.
3.
Connect power cord and Ethernet cable to the BTS. For the details, please refer
to the document “A8 Cable Connection Guide”.
Figure 9-1
Metal tape to metal plate (front-view)
Figure 9-2 Mount A8 BTS on the metal plate
(side-view)
10.
Mounting A8 Base Station on the Wall
1.
Use an electric drill to drill four suitable apertures on the wall. (It is strongly
recommended that mark the suitable positions on the wall by pencil before
drilling).
2.
Put the wall plugs into the apertures.
3.
Place the metal plate on the wall such that the four holes on the metal plate
match the apertures you drilled before.
4.
For each of the wall plug, use the self-tapping metal screw with a flat washer
(Part E in Figure 4-1) to fix the metal plate, Figure 10-1.
5.
The fixed metal plate is shown in Figure 10-2.
6.
Following the steps on step 2 to step 4 of “Section9 - Mounting A8 Base Station on
the Pole”.