![alpro Weekend-System II Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/alpro/weekend-system-ii/weekend-system-ii_installation-manual_2908750018.webp)
18
Procedure
a) Check if enough BILPRON is in the tank:
The level indicator at
the side has to show
a liquid level at
„Max.“
b) Switch on Weekend-System II:
1. First turn off the water:
Set the water stop
(ball valve) on
„I“
.
2. Then pressurize the tank:
Set the toggle switch of
the pressure valve on
„I“
.
c) Adjust all instruments
to maximum flow
and remove them:
8.3. Timing of use
Before work breaks lasting several days:
Initiate BILPRON.
Max.
n.N
Min.
N
2.
1.
Decontami-
nation:
Set all levers
on
„I“
Remarks
Filling of the tank:
see chapter 7.2
The operating agents are on
the side cover.
Содержание Weekend-System II
Страница 2: ......