When commissioning the system, ensure the Benchmark Checklist at the back of these instructions is completed.

5.1  FILL THE SOLAR CYLINDER

1.  Check that all the mains water connections are tight and any drain valves are closed.
2.  Open the mains water inlet valve. Thoroughly flush out the hot water system by turning on all the hot water taps and 

allow the water to flow until no air is present, this will automatically vent the cylinder of air. Turn off each tap.

3.  It is important to vent the solar cylinder and solar pump.
 

Vent the cylinder using the vent point in the drain back unit as shown in Fig. 22. Vent the cylinder pump by unscrewing 
the centre cap (see Fig. 20) and rotate the spindle using a small screwdriver until water runs from it and then replace 
the cap. Ensure the area around the pump is dry.

4.  Isolate the mains inlet and drain the cylinder to remove any debris that may have collected in the cylinder. Refill and 

vent the system as described above.

5.  Check the operation of the two pressure relief valves (see Fig. 20) by turning the head anti-clockwise until it clicks. The 

click is the valve lifting off its seat allowing water to escape 
from the system - check that this is actually happening.

5.2  FILL THE DRAIN BACK UNIT

1.  Unscrew the level point cap from the fitting in the flow pipe 

above the pump (Fig. 22).

2.  Fill using standard domestic water with a funnel and hose via 

the 22 mm collector return connection until the water spills 
from the fill level point.

3.  Carefully fill the drain back unit until water overflows from the 

fill level point in the pipe above the pump. This indicates the 
correct fill level has been reached.

 

Note: 

Do not overfill.

4.  Replace the level point cap to the fitting in the pipe above the 

pump.

5.  Check that all the wiring has been correctly installed and that 

all the terminal connections are tight.

 

Switch on the electrical supply and press the On/Off button on 
the control panel (see Fig. 23) to start the system.

6.  Check for any leaks and replace the front cover.
7.  Complete the details of the installation in the Benchmark 

Checklist at the back of these instructions.

5.3  CONTROL UNIT DISPLAY - Fig. 23

The Solar cylinder is fitted with a control unit with integrated display panel and push button controls. The display indicates the 
working modes of the system with symbols to indicate the working components of the complete system.
When first switched on, the display will show all the symbols as shown in Fig. 23 for 2 seconds then the system schematic 
is displayed and the countdown from 70 seconds to 0 will start (see Fig. 24). During this countdown the unit does a self-
diagnosis of all the sensors and pumps. If the collector temperature is between 10 and 130°C the drain back unit pump will 
run for a short period to run a test program, after which the system is ready for use.
When all the self-diagnostic procedures have been completed the system will start normal operation.
After the 70 second countdown the normal operating display will appear with a schematic diagram of the system and 
showing two temperatures. The top value indicating the temperature at the collector sensor (S3) and the bottom value 
indicating the upper cylinder sensor temperature (S1) as shown in Fig. 25.
The system can be turned on and off using the On/Off button, however we recommend that the system is left in the on 
position permanently and it will control itself depending on the solar energy available and the cylinder temperature.
If there is enough solar light at the collector the cylinder pump will run, shortly followed by the drain back unit pump.

Alpha SolarSmart 100 - Commissioning

5  COMMISSIONING

Fig. 22

Filling point (22mm return connection)

Fill level

Pump

Drain point
(collector circuit)

Vent point
(cylinder circuit)

Level point cap

Содержание SolarSmart 100

Страница 1: ...ions have been carefully prepared but we reserve the right to alter the specification at any time in the interest of product improvement Alpha Therm Limited 2014 Part No 1 032744 ST15 000233 0314 D337...

Страница 2: ...emedial or improvement work identified during the course of commissioning or servicing work Refer to the manufacturer s helpline where assistance is needed Report product faults and concerns to the ma...

Страница 3: ...t of the Environment i e Approved Document L1 Building Standards Scotland Consolidation Regulations issued by the Scottish Development Department UK Water Regulations Byelaws Scotland Health Safety Do...

Страница 4: ...ction Return Connection Max Working Pressure Heat Exchanger Content Collector Circuit Flow Connection Return Connection Max Working Pressure Vessel Size Max Filled Content Case Insulation 2 2 SOLAR CO...

Страница 5: ...Energy Loss of Solar Cylinder Global Warming Potential Ozone Depletion Potential Insulation Blowing Agent The collector installation must be carried out using the kits and connections supplied by Alp...

Страница 6: ...e 11 Expansion vessel 12 Immersion heater boss use Alpha immersion kit only 13 Drain point for cylinder 14 Pressure relief valve 15 Inlet filter 16 Pressure reducing valve 17 Tundish 18 Isolation valv...

Страница 7: ...e in 15 mm copper pipe and be as short as possible Where possible the pipework should be insulated to reduce heat loss Thoroughly flush out the mains water supply pipe before connecting it to the boil...

Страница 8: ...is 9 m Subtract the resistance for four 22 mm elbows of 0 8 m each 3 2 m Therefore the maximum permitted length equates to 9 3 2 5 8 m 5 8 m is less than the actual length of 7 m therefore calculate...

Страница 9: ...itch or cylinder control utilizing mains electricity The bottom of the solar cylinder must be located within 6 metres vertically of the top of the drain back unit Dimensions The dimensions of the cyli...

Страница 10: ...to the DBU The pipework must be insulated with high temperature insulation Dimensions The dimensions of the DBU and clearances required for servicing are shown in Fig 5 Fig 5 DBU Connections A Return...

Страница 11: ...g from the sun One solar collector is required upto a maximum of two collectors can be installed using one of the following methods a Integration of the collector into the tiles of a pitched roof Usin...

Страница 12: ...ctor is fixed at an inclination of 30 and ballast or fixings must be used to secure the frame in the required position Refer to Fig 9 for details of location of the drain back unit in relation to the...

Страница 13: ...3 023223 b Twin collectors portrait or landscape Part No 3 023241 8 Solar collect On Slates kits a Single collector portrait or landscape Part No 3 023224 b Twin collectors portrait or landscape Part...

Страница 14: ...the template includes the minimum clearances required and mark the positions of the fixing holes Drill the holes to suit the fixing supplied or alternative fixings suitable for the mounting surface w...

Страница 15: ...the fixing supplied or alternative fixings suitable for the mounting surface wall If using only the top fixings fit two of the screws supplied with the heads about 5 mm proud so that they will locate...

Страница 16: ...lastic caps are removed from all connections Note If soldering union bends ensure that the bends are not connected to the valves etc otherwise the internal seals may be damaged soldered connections ca...

Страница 17: ...res to terminals 45 and 46 the polarity is not important on the terminal block Ensure that the cable is secured in the cable clamp 5 Connect the Mains Supply The solar cylinder has been fitted with a...

Страница 18: ...tly installed and that all the terminal connections are tight Switch on the electrical supply and press the On Off button on the control panel see Fig 23 to start the system 6 Check for any leaks and...

Страница 19: ...and S3 S3 is always the upper temperature on the display Button Description Description Function Function Symbol State Decription DBU pump Cylinder pump Warning Sun Degrees celsius Digits Temperature...

Страница 20: ...ler hot water thermostat to be left at the maximum position No 9 and that it is the purpose of the label Fig 18 to maintain this and that the label must not be removed 5 Weekly cleaning of shower head...

Страница 21: ...cylinder sensor and the solar cylinder temperature is less than 65 C the drain back unit pump will start to circulate water around the collector At the same time that the drain back unit pump starts...

Страница 22: ...ended that it is inspected and checked by a competent person as necessary at regular intervals Warning Before removing any covers or working on the system isolate the electrical supply The data badge...

Страница 23: ...scribed in Section 8 2 Disconnect the union from the bottom of the expansion vessel and remove the locknut see Fig 27 then carefully lift the vessel out Reassemble in reverse order with a new vessel a...

Страница 24: ...taken when carrying out repairs to the DBU as it reaches very high temperatures and can emit steam from connections when being removed Isolate the mains electric supply and remove the front case of th...

Страница 25: ...plug housing with another spanner to prevent damaging the pipe Expect about 8 litres Loosen the flow and return connections beneath the drain back unit and slacken the locknuts Disconnect the flow an...

Страница 26: ...ctor has the correct fall and length Check the collector sensor and the lower cylinder sensor do they operate check sensor resistance in Section 10 3 Check the collector tubes are they blocked with di...

Страница 27: ...INDER SENSOR TEMPERATURE and RESISTANCE DATA Temperature C 0 20 50 80 105 130 160 Resistance Ohm 20 Ohm 1000 1100 1200 1300 1400 1500 1600 Collector Sensor Resistance Table Temperature C 25 30 65 85 R...

Страница 28: ...sembly Ref Description Qty Part No Solar Cylinder Assembly Note Washers and seals are not supplied with the replacement components and the relevant seals kit should also be used Ref Description Qty Pa...

Страница 29: ...washers Complete seals kit all DBU seals washers Wall fixing pack plugs screws Collector sensor Collector sensor extension lead 1 2 3 4 5 6 7 8 1 1 1 2 1 1 1 2 1 1 1 1 1 1 026759 1 033644 1 033420 1 0...

Страница 30: ...luid details What type make of heat transfer fluid used System volume litres What is the fluid mix Water Glycol Frost protection provided to C Is the installation in a hard water area above 200ppm Yes...

Страница 31: ...mpleted YES NO Engineer Name Company Name Telephone Number Comments Signature Date Energy Efficiency Checklist completed YES NO Engineer Name Company Name Telephone Number Comments Signature Date Date...

Страница 32: ...ed Kingdom What this warranty does not cover Free of charge repairs to appliances that have not been installed by a qualified and competent person Repairs to appliances that have not been installed an...

Страница 33: ...ly failure the system will not operate When the supply is restored the system will return to normal operation If the mains water supply fails there will be no hot water from the taps 3 Pressure Relief...

Страница 34: ...starts the cylinder pump will start at 16 full speed to circulate the cylinder water through the drain back unit heat exchanger The drain back unit pump will stop when the temperature difference betwe...

Страница 35: ...isplay panel and push button controls The display indicates the working modes of the system with symbols to indicate the working components of the complete system 2 USER CONTROLS Fig 1 S1 S 2 3S S1 S...

Страница 36: ...ully prepared but we reserve the right to alter the specification at any time in the interest of product improvement Alpha Therm Limited 2014 Part No 1 032744 ST15 000233 0314 D337 Alpha Therm Limited...

Отзывы: