User Manual: revA_3521
Page
17
of
24
MODULE TO MODULE(B)
4.3 Installation
4.3.1 Installation check
Please check again by on-site personnel on the following conditions or equipment whether meet the
requirements before installation:
Check
if there’s enough space for installation, and if the load-bearing capacity of the bracket or
cabinet meets the weight requirements
Check whether the power cable used meets the maximum current requirement for operation;
Check whether the overall layout of power supply equipment and batteries at the construction
site is reasonable;
Check whether the installer is wearing anti-static wristband
Check whether
there’re two people on the construction site for installation work
Check if there’s potential risks at location of installation site, e.g. flooding, sun exposure,
corrosion, and salt spray
Содержание AOESS48V-LFP4100
Страница 1: ......
Страница 26: ...User Manual revA_3521 Page 25 of 24...