User Manual: revA_3521
Page
16
of
24
4.2 Unpack
4.2.1 Unpack precautions
Please load and unload it in accordance with the specified requirements to prevent sun and rain
when you receive the equipment.
Please check and confirm the goods (such as quantity, package appearance, etc.) according
to the "delivery list" before unpacking.
Do light take and put during unpacking process to protect the surface coating of the object;
Please record and feedback to the manufacturer if the inner packing is damaged after unpacking.
4.2.2 Packing list
One carton contains the items listed below, please check carefully after unpacking.
PACK
Communication (optional)
Paper/E-User Guide
Factory report & BOM
4.2.3 wiring harness
Provided:
MODULE to MODULE(A)
300mm
Communication cable
1
MODULE TO MODULE (POSITIVE)
250mm
Power cable in parallel
1
MODULE TO MODULE (NEGATIVE)
250mm
Power cable in parallel
1
MODULE TO MODULE(B)
300mm
Ground cable
1
Each MODULE
/
CAN TERMINAL Resistor
1
MODULE TO MODULE(A)
MODULE TO MODULE (POSITIVE)
MODULE TO MODULE (NEGATIVE)
Содержание AOESS48V-LFP4100
Страница 1: ......
Страница 26: ...User Manual revA_3521 Page 25 of 24...