Send completion report for heat pump systems
and general checklist to the manufacturer’s factory
customer service department…
In other countries:
Send completion report for heat pump systems
and general checklist to the manufacturer’s local
partner…
The heat pump system is commissioned by customer
service personnel authorised by the manufacturer.
There is a fee for starting up!
Commissioning
DANGER!
Prior to commissioning the unit, the air
flow baffles must be mounted and the
facing panels closed.
NOTE.
The commissioning has to be in the heating
mode.
Carry out a thorough installation check and work
through the general checklist…
Manufacturer’s homepage.
By checking the installation you prevent damage to
the heat pump system, which could be caused by
work carried out improperly.
Check that…
•
clockwise rotary field
of the load power supply
(compressor) is ensured.
•
The heat pump
installation and assembly
have
been carried out according to the requirements
of this operating manual.
•
the electrical installation work has been
completed properly.
•
The power supply for the heat pump must be
equipped with an all-pole automatic circuit-
breaker with at least 3 mm contact spacing to IEC
60947-2.
•
The heating circuit is flushed, filled and thoroughly
vented.
•
All valves and shut-off devices of the heating
circuit are open.
•
All pipe systems and components of the system
are leaktight.
Carefully fill out and sign the completion report for
heat pump systems...