Installation
Connection of CT meter ADL-3000CT(1) - grid side
P
lease connect CT “S1” to Meter L1, CT “S2” to Meter L1’. Please connect CT “S1” to Meter
L2, CT “S2” to Meter L2’. Please connect CT “S1” to Meter L3, CT “S2” to Meter L3’.
Connection of CT meter ADL-3000CT(2) - AC side of PV-INV
By connecting L1, pleas
e connect CT “S1” to Meter L1, CT “S2” to Meter L1’. By connecting L2,
please connect CT “S1” to Meter L2, CT “S2” to Meter L2’. By connecting L3, please connect
CT “S1” to Meter L3, CT “S2” to Meter L3’.
CT Meter and LAN Communication Cabling
The communication connections are as shown in Figure 4.9 on previous page as a green dotted
line.
The communication cable connection process to connect to the EMS is shown in the following
steps are as follows: