__________________________________________________________________________________
Alpha ESS Co., Ltd.
Page 31 of 59
Your Smart Energy
Installation
Figure 4.6 DC Cabling
Notes: You can hide the long cables in the cabinet wire casing. And when
connecting the battery power cables, pay attention to plugging the plug of the
corresponding color into the socket of the battery, red to red, black to black.
Communication-Cabling
Connect the communication cables between Batteries, Battery and HV900112 following figure
in the Figure 4.7.
Содержание Storion-T30
Страница 1: ...Installation Operation Maintenance Manual Energy Storage System ESS Storion T30 V02 ...
Страница 2: ......
Страница 8: ......