__________________________________________________________________________________
Alpha ESS Co., Ltd.
Page 37 of 59
Your Smart Energy
Installation
Note: The inserted SD card holds all the data of the system, and if you remove the
SD card, all the data would be lost
.
Inverter Wiring
Step 1: Remove the plastic protective cover at the connection point.
Step 2: Remove the power cable bond from the packing list of cabinet and attach the cable
bond to the power cable from the grid as shown in Figure 4.13.
Figure 4.13 AC auxiliary power cables connection
Step 3: Take the L and N auxiliary power cables away from the T30-INV. After that connect the
L1, L2, L3 and N power cables to the inverter, the cables shall be routed through the cable way
(wire casing) as shown in Figure 4.14. In view of the requirements of connecting cables, single
or multiple cables with suitable diameter shall be selected. A 10 mm² cable with copper core is
suggested for each phase.
Notes:
The role of the auxiliary power is to supply the electronic components inside
the HV900112. The auxiliary source line is in parallel with the AC side power line flowing
into the inverter. Therefore, even though the auxiliary source line is very small in
diameter, it does not pose any danger.
Screw
Protective cover
AC auxiliary powers
cables
Содержание Storion-T30
Страница 1: ...Installation Operation Maintenance Manual Energy Storage System ESS Storion T30 V02 ...
Страница 2: ......
Страница 8: ......