`
___________________________________________________________________
Alpha ESS Co., Ltd.
Page 11 of 46
Your Smart Energy
Installation
Figure 2.3 Storion-SMILE-B3 Left View
Table 5 Ports Definition
Name
Description
BMS
Additional battery BMS communicate cable connect
DRMs
DRED connect port (only for AU)
CT1
PV CT communicate cable
CT2
Grid CT communication cable
BAT+
Additional battery power positive cable connect
BAT-
Additional battery power negative cable connect
BACKUP Critical load connect
GRID
Grid connect
Figure 2.4 Storion-SMILE-B3 Rear View
80A battery switch
Содержание Storion-SMILE-B3
Страница 1: ...V07 Installation Operation Manual Energy Storage System ESS Storion SMILE B3 ...
Страница 2: ......
Страница 6: ......